# US 8,578,023 B2 · Computer resource utilization modeling for multiple workloads

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,578,023 B2
- Document ID: US8578023B2
- Status: Granted
- Kind: B2
- Application number: 13/194,505
- Filed: 2011-07-29
- Published: 2013-01-31
- Granted: 2013-11-05
- Earliest claimed: 2011-07-29
- Assignees: Hewlett-Packard Development Company, L.P.
- Applicants: Wade J Satterfield; Michael R Stabnow; Todd M Spencer; Jon Duane Warden; Zengfa Gao; James Eugene Wade
- Inventors: Wade J Satterfield; Michael R Stabnow; Todd M Spencer; Jon Duane Warden; Zengfa Gao; James Eugene Wade
- Web page: https://patentgrep.com/patent/US8578023B2

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Computer resource utilization modeling for multiple workloads includes a computer obtaining resource utilization data, the resource utilization data having groups of computer resource utilization measurements made during time intervals for a plurality of workloads. The computer determines parameters representing a distribution of the computer resource utilization measurements for each of the groups to generate a baseline of distributions across the time intervals for each of the plurality of workloads. The computer sums the baselines of distributions for the plurality of workloads to generate a combined baseline of distributions across the time intervals for a combination of the plurality of workloads.

## Claims

### Claim 1

A method, comprising:
making, via a computer, utilization measurements of at least one computer resource during time intervals for a plurality of workloads;
grouping, via the computer, the computer resource utilization measurements into groups;
determining, via the computer, parameters representing a probability distribution of the computer resource utilization measurements for each of the groups;
generating, via the computer, from the determined parameters; a baseline as a set of the probability distributions across the time intervals for each of the plurality of workloads; and
generating, via the computer, a combination of the baselines as a combined baseline of probability distributions across the time intervals for a combination of the plurality of workloads.

### Claim 2 (depends on 1)

The method of claim 1, wherein the determined parameters for each of the groups include at least one of a location parameter, a scale parameter, or a shape parameter.

### Claim 3 (depends on 1)

The method of claim 1, wherein generating the combination of the baselines includes summing the combination of the baselines.

### Claim 4 (depends on 1)

The method of claim 1, wherein the determined parameters for each of the groups include a mean and one selected from a group comprising a percentile and a standard deviation.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
scaling the determined parameters for the groups corresponding to at least one of the plurality of workloads.

### Claim 6

An apparatus to model computer resource utilization, comprising:
a memory to store computer resource utilization data, the computer resource utilization data having a plurality of workload data sets for a respective plurality of workloads, each of the plurality of workload data sets including computer resource utilization measurements made across a plurality of time intervals; and
a processor to access the computer resource utilization data in the memory, to process the computer resource utilization measurements in the plurality of workload data sets to generate parameters representing per-workload baselines of probability distributions across the plurality of time intervals for the plurality of workload data sets, and to process the parameters to generate a combined baseline of probability distributions for a combination of the plurality of workloads from the per-workload baselines of probability distributions.

### Claim 7 (depends on 6)

The apparatus of claim 6, wherein the parameters include at least one of a location parameter, a scale parameter, or a shape parameter for the computer resource utilization measurements for each of the plurality of time intervals for each of the plurality of workload data sets.

### Claim 8 (depends on 6)

The apparatus of claim 6, wherein the processor scales the parameters for at least one of the workload data sets.

### Claim 9 (depends on 6)

The apparatus of claim 6, wherein the processor processes the combined baseline of probability distributions for the combination of the plurality of workloads to generate at least one metric.

### Claim 10 (depends on 9)

The apparatus of claim 9, wherein the at least one metric includes an estimate of a mean computer resource utilization by the combination of the plurality of workloads.

### Claim 11 (depends on 9)

The apparatus of claim 9, wherein the at least one metric includes an estimate of peak computer resource utilization by the combination of the plurality of workloads in at least one of the plurality of time intervals.

### Claim 12 (depends on 9)

The apparatus of claim 9, wherein the at least one metric includes an estimate of computer resource utilization expected to be exceeded by the combination of the plurality of workloads a defined percentage of time within the plurality of time intervals.

### Claim 13

A method, comprising:
obtaining, via a computer resource, utilization data of the computer resource for a plurality of workloads over a plurality of time intervals;
determining, via the computer resource, probability distribution parameters from the computer resource utilization data for each of the plurality of time intervals;
generating, via the computer resource, an individual baseline across the plurality of time intervals for each of the plurality of workloads from the probability distribution parameters;
summing, via the computer resource, the individual baselines for the plurality of workloads into a combined baseline across the plurality of time intervals for a combination of the plurality of workloads; and
determining, via the computer resource, at least one metric from the combined baseline.

### Claim 14 (depends on 13)

The method of claim 13, wherein the probability distribution parameters include at least one of location parameters, scale parameters, and shape parameters.

### Claim 15 (depends on 13)

The method of claim 13, wherein the probability distribution parameters for each of the groups include a mean and a percentile.

### Claim 16 (depends on 13)

The method of claim 13, wherein the probability distribution parameters for each of the groups include a mean and a standard deviation.

### Claim 17 (depends on 13)

The method of claim 13, further comprising: scaling, via the computer resource, the probability distribution parameters for at least one of the plurality of workloads.

### Claim 18 (depends on 13)

The method of claim 13, wherein the at least one metric includes an estimate of a mean computer resource utilization by the combination of the plurality of workloads.

### Claim 19 (depends on 13)

The method of claim 13, wherein the at least one metric includes an estimate of peak computer resource utilization by the combination of the plurality of workloads in at least one of the plurality of time intervals.

### Claim 20 (depends on 13)

The method of claim 13, wherein the at least one metric includes an estimate of computer resource utilization expected to be exceeded by the combination of the plurality of workloads a defined percentage of time within the plurality of time intervals.
