Method for starting a turbomachine
AssigneeGeneral Electric Company
InventorsDavid A. Snider, William F. Seely, John C. Maters, Eugene A. Post, Samuel B. Shartzer
Life of this patent
Estimating the term…
Loading patent…
AssigneeGeneral Electric Company
InventorsDavid A. Snider, William F. Seely, John C. Maters, Eugene A. Post, Samuel B. Shartzer
Estimating the term…
Embodiments of the present invention employ a closed loop controls philosophy, which actively controls the starting means of a powerplant machine, throughout the start-up process. Here, the present invention may provide a method for adjusting a nominal operating schedule of the starting means, which may have the form of a Load Commutated Inverter (LCI). Embodiments of the method may adjust the nominal operating schedule based, in part, on an operating parameter, which is associated with the gas turbine 100. The operating parameter may include, but is not limited to: a rotor speed, a desired start-up time, or the like. Here, the control system may receive data on the operating parameter associated with the gas turbine.
A method of actively controlling a starting system during a starting process of the powerplant machine, the method comprising:
A method of actively controlling a Load Commutated Inverter (LCI) during a starting process of the gas turbine, the method comprising:
A system for actively controlling a Load Commutated Inverter (LCI) during a starting process of the gas turbine, the system comprising:
Dependencies are inferred from the claim text.