System and method for predicting cooling performance of arrangements of equipment in a data center
AssigneeSchneider Electric It Corporation
InventorsJames W. VanGilder, Xuanhang Zhang
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchneider Electric It Corporation
InventorsJames W. VanGilder, Xuanhang Zhang
Estimating the term…
A system and method for evaluating equipment in an improper cluster in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider. In one aspect, the method includes receiving data regarding each of the plurality of equipment racks and the at least one cooling provider, the data including a layout of the improper cluster of equipment racks and the at least one cooling provider, storing the received data, identifying at least one gap in the layout, determining cooling performance of at least one of the plurality of equipment racks based, at least in part, on characteristics of the at least one gap, and displaying the layout of the data center, wherein the layout includes an indication of the cooling performance of the at least one of the plurality of equipment racks.
A method for evaluating equipment in an improper cluster in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider, the method comprising:
A system for evaluating equipment in an improper cluster in a data center, the equipment including a plurality of equipment racks, and at least one cooling provider, the system comprising:
A non-transitory computer readable medium having stored thereon sequences of instructions including instructions that will cause a processor to:
Dependencies are inferred from the claim text.