Method and apparatus for effecting controlled restart of electrical servcie with a utility service area
AssigneeConsert Inc.
InventorsJoseph W. Forbes, Jr., Joel L. Webb
Life of this patent
Estimating the term…
Loading patent…
AssigneeConsert Inc.
InventorsJoseph W. Forbes, Jr., Joel L. Webb
Estimating the term…
An active load management system (ALMS) controllably restarts electrical service to service points in a utility service area after a power outage. The ALMS includes client devices installed at the service points and a central controller. In one embodiment, the controller associates numbers with the service points and stores the associations. Each service point may be associated with a unique number or a group of service points may share a number. After receiving notification that power is available, the controller determines a number and communicates the number to one or more of the client devices. Where the number was determined randomly, the client devices associated with the number may restart electrical service upon receipt of the number. Where the number was determined sequentially, a client device may determine its own random number and compare it to the received number. If a match occurs, electrical service can be restarted.
A method for restarting electrical service at a service point in a utility service area after a power stoppage, the method comprising:
A method for a control device to restart electrical service at a service point in a utility service area after a power stoppage, the control device being installed at the service point and controlling a supply of electrical power to at least one power consuming device located at the service point, the method comprising:
A method for a central controller to restart electrical service at a plurality of service points in a utility service area after a power stoppage, the central controller being located remotely from the plurality of service points, each service point of the plurality of service points including a control device, each control device controlling a supply of electrical power to at least one power consuming device located at a corresponding service point, the method comprising:
A method for restarting electrical service at a plurality of service points in a utility service area after a power stoppage, each service point of the plurality of service points including a control device of a plurality of control devices, each control device controlling a supply of electrical power to one or more power consuming devices located at a corresponding service point, the method comprising:
A method for a control device to restart electrical service at a service point in a utility service area after a power stoppage, the control device being installed at the service point and controlling a supply of electrical power to at least one power consuming device located at the service point, the method comprising:
A method for a central controller to restart electrical service at a plurality of service points in a utility service area after a power stoppage, the central controller being located remotely from the plurality of service points, each service point of the plurality of service points including a control device, each control device controlling a supply of electrical power to at least one power consuming device located at a corresponding service point, the method comprising:
A method for a central controller to restart electrical service at a plurality of service points in a utility service area after a power stoppage, the central controller being located remotely from the plurality of service points, each service point of the plurality of service points including a control device, each control device controlling a supply of electrical power to at least one power consuming device located at a corresponding service point, the method comprising:
A central controller for use in an active load management system that includes a plurality of client devices installed at a plurality of service points located in a service area of a utility, the plurality of service points being located remotely from the central controller, the central controller comprising:
A control device for use in an active load management system that includes a central controller located remotely from the control device, the control device being installed at a service point located in a service area of a utility and providing power control commands to one or more controllable devices which control a flow of electric power to one or more power consuming devices located at the service point, the control device comprising:
An active load management system operable to controllably restart electrical service to a plurality of service points in a service area of an electrical utility after a power stoppage, the active load management system comprising:
Dependencies are inferred from the claim text.