Phase-control switchgear and phase-control method for switchgear
AssigneeMitsubishi Electric Corporation
InventorsSadayuki Kinoshita, Kenji Kamei, Tomohito Mori, Hiroki Ito
Life of this patent
Estimating the term…
Loading patent…
AssigneeMitsubishi Electric Corporation
InventorsSadayuki Kinoshita, Kenji Kamei, Tomohito Mori, Hiroki Ito
Estimating the term…
A phase-control switchgear includes a circuit breaker, a phase difference detection unit, a storage unit, and a circuit breaker control unit. The phase difference detection unit detects a phase difference between voltages of a specific phase (U-phase) of buses to which three-phase generators are respectively connected, at a plurality of time points. The storage unit stores the detected phase differences. When the three-phase generators are out of synchronization, the circuit breaker control unit estimates a breaking time point at which the phase difference between the voltages of the U-phase of the buses will be in the range of not less than −80° and not more than 80°, based on the phase differences at the plurality of time points stored in the storage unit. The circuit breaker control unit opens the circuit breaker to break a current at the estimated breaking time point. This makes it possible to suppress a transient voltage generated between electrodes of the circuit breaker after the current is broken.
A phase-control switchgear provided to a multi-phase AC power transmission line connecting between first and second buses, first and second multi-phase generators being connected to said first and second buses, respectively,
A phase-control switchgear provided to a single-phase AC power transmission line connecting between first and second buses, first and second single-phase generators being connected to said first and second buses, respectively,
A phase-control method for a switchgear provided to a multi-phase AC power transmission line connecting between first and second buses, first and second multi-phase generators being connected to said first and second buses, respectively,