Method and apparatus for cell-based workforce scheduling
AssigneeVerint Americas Inc.
InventorEdward Hamilton
Life of this patent
Estimating the term…
Loading patent…
AssigneeVerint Americas Inc.
InventorEdward Hamilton
Estimating the term…
A method for workforce scheduling by a computer system is provided. The method includes receiving a first workforce schedule describing initial assignments of a plurality of workers to a plurality of shifts, each shift comprising one or more work activities, each work activity comprising an activity and a time interval, and storing the first workforce schedule in a memory. The method also includes receiving a cell size associated with each activity, and determining a quantity of workers in each work activity associated with each activity in the first workforce schedule. The method further includes determining cell size violations by dividing the quantity of workers assigned to each work activity by the cell size for the activity associated with the work activity. The method also includes modifying the first workforce schedule to minimize cell size violations, resulting in a second workforce schedule, and storing the second workforce schedule in the memory.
A computer implemented method for operating a computer system as a cell-based workforce scheduler to minimize occurrences of broken cells, the method comprising:
A non-transitory computer readable medium having stored thereon program instructions for cell scheduling of a workforce to minimize occurrences of broken cells, that when executed by a computer processor, direct the computer processor to:
Dependencies are inferred from the claim text.