Controlling well operations based on monitored parameters of cement health
AssigneeHalliburton Energy Services, Inc.
InventorsKris Ravi, Etienne M. Samson, John L. Maida, Jr., William Hunter
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsKris Ravi, Etienne M. Samson, John L. Maida, Jr., William Hunter
Estimating the term…
A method of controlling a well operation can include monitoring at least one parameter of cement lining a wellbore, the monitoring being performed via at least one optical waveguide, and modifying the well operation in response to the parameter being outside of a predetermined acceptable range. A well monitoring system can include at least one optical waveguide which is used to sense at least one parameter of cement lining a wellbore, an optical interrogation system optically connected to the at least one optical waveguide, and a control system which controls operation of at least one item of well equipment in response to information received from the optical interrogation system.
A method of controlling a well operation, the method comprising:
A method of controlling a well operation, the method comprising:
A method of controlling a well operation, the method comprising:
A method of controlling a well operation, the method comprising:
A method of controlling a well operation, the method comprising:
A well monitoring system, comprising:
A well monitoring system, comprising:
A well monitoring system, comprising:
A well monitoring system, comprising:
Dependencies are inferred from the claim text.