Construction method of steel composition girder bridge
AssigneesHyung Kyun Byun, Mi Young Lim, Yong Joo Kim
InventorsYong Joo Kim, Jae Min Kim
Life of this patent
Estimating the term…
Loading patent…
AssigneesHyung Kyun Byun, Mi Young Lim, Yong Joo Kim
InventorsYong Joo Kim, Jae Min Kim
Estimating the term…
A construction method of a steel composite girder bridge includes installing steel girders on piers and forming shearing connectors on the steel girders at intervals of a predetermined distance, installing stagings and a first form for casting deck concrete in the steel girders, installing non-composite members in an upper flange of the steel girders to form each non-composite section of supporting points, installing a second form around each of the shearing connectors to form a shearing pocket, arranging sheath pipes in the supporting points and forming supporting point decks by casting and curing concrete, applying pre-stress to each section of the supporting point decks through the sheath pipes and performing a grouting process, forming span decks adjacent to the supporting point decks by casting and curing concrete in each span between the piers, and filling the shearing pockets with non-shrinkage mortar.
A construction method of a steel composite girder bridge, the method comprising:
Dependencies are inferred from the claim text.