# US 8,464,654 B2 · Hot-dip galvanizing installation for steel strip

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,464,654 B2
- Document ID: US8464654B2
- Status: Granted
- Kind: B2
- Application number: 12/866,788
- Filed: 2008-02-08
- Published: 2010-12-09
- Granted: 2013-06-18
- Earliest claimed: 2008-02-08
- Assignees: Siemens Vai Metals Technologies GmbH
- Applicants: Stephane Barjon; Laurent Cloutot; Arnaud D'Halluin; Benjamin Grenier
- Inventors: Stephane Barjon; Laurent Cloutot; Arnaud D'Halluin; Benjamin Grenier
- Web page: https://patentgrep.com/patent/US8464654B2

## CPC

- C23C 2/00344: {Means for moving substrates, e.g. immersed rollers or immersed bearings}
- C23C 2/0038: {characterised by the pre-treatment chambers located immediately upstream of the bath or occurring locally before the dipping process}
- C23C: COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL (making metal-coated products by extrusion B21C23/22; covering with metal by connecting pre-existing layers to articles, see the relevant places, e.g. B21D39/00, B23K; metallising of glass C03C; metallising mortars, concrete, artificial stone, ceramics or natural stone C04B41/00; enamelling of, or applying a vitreous layer to, metals C23D; treating metal surfaces or coating of metals by electrolysis or electrophoresis C25D; single-crystal film growth C30B; by metallising textiles D06M11/83; decorating textiles by locally metallising D06Q1/04)

## Abstract

An installation for the hardened galvanization of a continuously-moving rolled steel strip, includes a coating tank receiving a liquid metal mixture containing, for example, zinc and aluminum to be deposited on the strip which is immersed in the mixture. The liquid mixture is permanently circulated between the coating tank and a preparation device, in which the temperature of the liquid mixture is deliberately lowered in order to reduce an iron solubility threshold and is sufficiently high for initiating fusion of at least one ingot containing a zinc-aluminum Zn—Al alloy in a so-called fusion zone of the preparation device, in an amount necessary to compensate for the liquid mixture used for deposition on the strip. The installation includes a loop for circulating the liquid mixture that is thermally optimized.

## Claims

### Claim 1

A hot-dip galvanizing installation for continuously moving rolled steel strip, the installation comprising:
a coating tank and a preparation device configured for continuously circulating a molten metal mixture therebetween;
said coating tank having a molten metal mixture inlet and being configured for immersing the strip in the molten metal mixture and depositing the molten metal mixture on the strip;
said preparation device including a first zone having a fusion zone, a second zone having an outlet and a molten-metal-mixture transfer device linking said first and second zones;
a local regulation device disposed in said first zone for lowering a temperature of the molten metal mixture if necessary as an aid to a required lowering of the temperature of the molten metal mixture being effected by selective dipping and removal of at least one metal ingot in said first zone;
said preparation device lowering the temperature of the molten metal mixture to reduce an iron solubility threshold and keep the temperature of the molten metal mixture at a temperature to activate fusion of the at least one metal ingot providing an additional supply of the molten metal mixture in said fusion zone, in sufficient quantity to offset the molten metal mixture deposited on the strip;
said preparation device imposing a sequential flow of the molten metal mixture from said coating tank, through said first zone fusing the metal ingot and causing dross to settle, through said transfer device and to said second zone receiving the molten metal mixture cleansed of dross and returned to circulation in said coating tank through a return-flow path of the cleansed molten metal mixture from said outlet to said inlet; and
a thermal adjustment device disposed along a flow of the molten mixture providing a thermal loop between said outlet and said inlet in said return-flow path.

### Claim 2 (depends on 1)

The installation according to claim 1, wherein the molten metal mixture is formed of zinc and aluminum.

### Claim 3 (depends on 1)

The installation according to claim 1, wherein said thermal adjustment device includes a first heating device for the molten metal mixture cleansed in said second zone.

### Claim 4 (depends on 3)

The installation according to claim 3, wherein said thermal adjustment device includes a second heating device for the molten metal mixture in said coating tank.

### Claim 5 (depends on 4)

The installation according to claim 4, wherein said second heating device is effected exothermically by supplying a motive force of the strip to be immersed in the molten metal mixture required to bring a quantity of molten metal mixture to a required temperature.

### Claim 6 (depends on 1)

The installation according to claim 1, wherein said thermal adjustment device includes a cooling device for cooling the molten metal mixture leaving said coating tank or in said fusion zone for the metal ingot, said cooling resulting in a minimal temperature threshold in said first zone of said preparation device being at a temperature for fusion of the metal ingot.

### Claim 7 (depends on 1)

The installation according to claim 1, wherein said first zone of said preparation device is configured for receiving at least one supply of metal ingots having a concentration required by the molten metal mixture in the preparation device.

### Claim 8 (depends on 1)

The installation according to claim 1, wherein said first zone of said preparation device is configured for receiving several supplies of metal ingots of which at least two have different aluminum concentrations and of which at least one of the metal ingots has a concentration higher than a concentration required by the molten metal mixture in said preparation device.

### Claim 9 (depends on 7)

The installation according to claim 7, wherein said first zone of said preparation device includes a device for regulating an overall rate of fusion of at least two of the metal ingots, by selective dipping and removal of at least one metal ingot in said first zone.

### Claim 10 (depends on 6)

The installation according to claim 6, wherein said first zone of said preparation device includes a device for adjusting a pre-set temperature reduction of the molten mixture in which the ingots are fused, by selective dipping and removal of at least one metal ingot in said first zone.

### Claim 11 (depends on 6)

The installation according to claim 6, wherein said first zone of said preparation device includes partitions isolating portions of the molten mixture placed between the metal ingots.

### Claim 12 (depends on 1)

The installation according to claim 1, wherein said coating tank includes a molten-metal-mixture bath supported by magnetic suspension.

### Claim 13 (depends on 1)

The installation according to claim 1, wherein said return-flow path includes at least one lifting pump drawing from said preparation device and feeding a chute at said inlet of said coating tank, said lifting pump having a pump inlet located in a dross-free interstice.

### Claim 14 (depends on 13)

The installation according to claim 13, wherein said lifting pump is a lifting pump linked to said return-flow path of the molten-metal mixture.

### Claim 15 (depends on 1)

The installation according to claim 1, wherein said transfer device includes a lifting pump with a pump inlet located at a central height of said first zone and a pump outlet in said second zone, said first and second zones being separated physically in the form of two different tanks.

### Claim 16 (depends on 1)

The installation according to claim 1, wherein said transfer device includes a separation device in the form of a vertical wall with a central aperture.

### Claim 17 (depends on 13)

The installation according to claim 13, which further comprises at least one filter chute placed between said feed chute of said coating tank and an outlet of said lifting pump.

### Claim 18 (depends on 17)

The installation according to claim 17, wherein said second zone of said preparation device includes a heating device and said second zone is located between said filter chute and said feed chute of said coating tank.

### Claim 19 (depends on 18)

The installation according to claim 18, wherein said second zone of said preparation device is disposed near said coating tank.

### Claim 20 (depends on 18)

The installation according to claim 18, wherein said second zone of said preparation device is disposed near an outlet of said first zone of said preparation device.

### Claim 21 (depends on 13)

The installation according to claim 13, wherein said outlet of said second zone of said preparation device is linked to said lifting pump having an outlet leading to said feed chute of said coating tank.

### Claim 22 (depends on 1)

The installation according to claim 1, wherein said first zone and said second zone of said preparation device are disposed at different heights and linked by a filter drain in a direction of flow, and the metal ingot is fused in said first zone in the direction of flow.

### Claim 23 (depends on 22)

The installation according to claim 22, wherein said second zone has a heating device in the direction of flow.

### Claim 24 (depends on 1)

The installation according to claim 1, wherein said preparation device has at least one flow-path portion for the molten metal mixture leading from an outlet of said coating tank, said at least one flow-path portion being juxtaposed side-by-side with a return-flow-path portion for the molten metal mixture leading through said inlet of said coating tank.

### Claim 25 (depends on 24)

The installation according to claim 24, wherein said flow-path portion and said return-flow-path portion have extremities opposite said coating tank being linked by at least one link device to ensure a change of flow direction of the molten metal mixture.

### Claim 26 (depends on 24)

The installation according to claim 24, wherein said return-flow-path portion includes an outlet leading to said coating tank and at least one delivery pump near said outlet.

### Claim 27 (depends on 26)

The installation according to claim 26, wherein said second zone is a cleansing zone, and said at least one delivery pump is disposed in said cleansing zone.

### Claim 28 (depends on 24)

The installation according to claim 24, wherein said flow-path portion is disposed in said first zone and said return-flow-path portion is disposed in said second zone.

### Claim 29 (depends on 25)

The installation according to claim 25, wherein at least one of said flow-path portion, said link device or said return-flow-path portion has at least one negative-slope drainage section.

### Claim 30 (depends on 25)

The installation according to claim 25, wherein said transfer device includes a separation device disposed upstream of said link device in a flow direction of the molten metal mixture.

### Claim 31 (depends on 1)

The installation according to claim 1, wherein said transfer device has a filter wall.

### Claim 32 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for measuring temperature and aluminum concentration of the molten metal mixture on at least a flow path from the inlet of said coating tank for the molten metal mixture to said outlet of said preparation device.

### Claim 33 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for measuring a molten metal mixture level in said preparation device.

### Claim 34 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for maintaining and adjusting a rate of flow and temperature of the molten metal mixture.

### Claim 35 (depends on 1)

The installation according to claim 1, which further comprises an ideally continuously activatable device for maintaining and adjusting a temperature of the strip leaving a galvanizing furnace linked to said coating tank.

### Claim 36 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for maintaining and adjusting a speed of movement of the strip.

### Claim 37 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for measuring a width and a thickness of the strip downstream of said coating tank.

### Claim 38 (depends on 1)

The installation according to claim 1, which further comprises a continuously activatable device for maintaining and adjusting an insertion dynamic for the metal ingots in said fusion zone of said preparation device.

### Claim 39 (depends on 1)

The installation according to claim 1, which further comprises a dynamic-parameter measurement control unit and an adjustment unit disposed at said coating tank and at said preparation device for adjusting dynamic parameters related to the strip.

### Claim 40 (depends on 39)

The installation according to claim 39, wherein said adjustment unit includes at least one of predictive parameter commands, a real-time control system or a self-learning process.

### Claim 41 (depends on 39)

The installation according to claim 39, wherein said adjustment unit includes external-command inputs parallel to said adjustment unit.

### Claim 42 (depends on 39)

The installation according to claim 39, wherein said preparation device includes means for keeping the temperature of the molten metal mixture at a temperature to activate fusion of the at least one metal ingot providing an additional supply of molten metal mixture in said fusion zone.