Device and method for controlling heating processes
AssigneeBSH Bosch und Siemens Hausgeraete GmbH
InventorsJohann Magg, Andreas Mayr, Markus Obermaier
Life of this patent
Estimating the term…
Abstract
A method for controlling heating processes in a coffee machine which is particularly suitable for preparing coffee on the basis of coffee pads. The coffee machine comprises a continuous flow heater and a pump used to convey water through the continuous flow heater. According to the inventive method, the temperature is measured in the region of the continuous flow heater and/or water which is conveyed by the pump. In order to avoid steam overpressure and to ensure a sufficient, constant temperature during the entire steeping process, the amount of water which is conveyed by the pump is influenced according to temperature. The invention also relates to an electronic control device.
Claims14
A coffee machine for preparing coffee using coffee pads, the coffee machine comprising:
- a brewing chamber;
- a continuous flow heater having an adjustable heating power;
- a pump for conveying water along a conveying section through the continuous flow heater to the brewing chamber;
- a plurality of temperature sensor sensors including a first temperature sensor disposed between the continuous flow heater and the brewing chamber, and a second temperature sensor disposed between the pump and the continuous flow heater;
- and
- an electronic control device including means for controlling production of steam in the continuous flow heater by influencing an amount of water conveyed by the pump in response to temperatures measured by the first and second temperature sensors,
- the electronic control device programmed to:
- switch the pump ON continuously such that the water is conveyed through the continuous flow heater to the brewing chamber;
- switch the continuous flow heater ON after switching the pump ON;
- measure a first temperature between the continuous flow heater and a brewing chamber with the first temperature sensor;
- after the switching the pump ON and the switching the continuous flow heater ON, control the production of the steam and the pressure in the continuous flow heater by:
- performing a pulsed operation of the pump, which includes switching the pump ON and OFF in an ON/OFF cycle ratio between switch-on time and switch-off time, when the first temperature of the water between the continuous flow heater and the brewing chamber is less than a predefined temperature threshold for optimum brewing;
- and
- repeating the pulsed operation of the pump when the first temperature of the water between the continuous flow heater and the brewing chamber is less than the predefined temperature threshold;
- and
- after performing the pulsed operation of the pump and repeating the pulsed operation of the pump, switch the pump ON continuously such that the water is conveyed through the continuous flow heater to the brewing chamber when the first temperature of the water between the continuous flow heater and the brewing chamber is greater than the predefined temperature threshold.
A method for controlling heating processes in a coffee machine, which is suitable for preparing coffee using coffee pads,
- wherein the coffee machine comprises a brewing chamber, a continuous flow heater having an adjustable heating power, a pump for conveying water through the continuous flow heater to the brewing chamber, a first temperature sensor disposed between the continuous flow heater and the brewing chamber, and an electronic control device for controlling production of steam and pressure in the continuous flow heater,
- the method comprising:
- switching the pump ON continuously such that the water is conveyed through the continuous flow heater to the brewing chamber;
- switching the continuous flow heater ON after the switching the pump ON;
- measuring a first temperature between the continuous flow heater and the brewing chamber with the first temperature sensor;
- after the switching the pump ON and the switching the continuous flow heater ON, controlling the production of the steam and the pressure in the continuous flow heater by influencing an amount of the water conveyed by the pump in response to the measured first temperature, wherein influencing the amount of the water includes:
- performing a pulsed operation of the pump when the first temperature of the water is less than a predefined temperature threshold for optimum brewing;
- and
- repeating the pulsed operation of the pump until the first temperature of the water is equal to the predefined temperature threshold,
- the pulsed operation including switching the pump ON and OFF in a predetermined ON/OFF cycle;
- and
- after the performing the pulsed operation of the pump and the repeating the pulsed operation of the pump, performing a continuous ON operation of the pump when the first temperature of the water is greater than the predefined temperature threshold.
A method for controlling a heating process in a coffee machine using coffee pads, wherein the coffee machine comprises a brewing chamber, a continuous flow heater having an adjustable heating power, a pump for conveying water through the continuous flow heater to the brewing chamber, a first temperature sensor disposed between the continuous flow heater and the brewing chamber, and an electronic control device for controlling production of steam in the continuous flow heater,
- the method comprising:
- switching the pump ON continuously such that the water is conveyed through the continuous flow heater to the brewing chamber;
- switching the continuous flow heater ON after the switching the pump ON;
- measuring a first temperature between the continuous flow heater and a brewing chamber with the first temperature sensor;
- after the switching the pump ON and the switching the continuous flow heater ON, controlling the production of the steam and the pressure in the continuous flow heater by:
- performing a pulsed operation of the pump, which includes switching the pump ON and OFF in an ON/OFF cycle ratio between switch-on time and switch-off time, when the first temperature of the water between the continuous flow heater and the brewing chamber is less than a predefined temperature threshold for optimum brewing;
- and
- repeating the pulsed operation of the pump when the first temperature of the water between the continuous flow heater and the brewing chamber is less than the predefined temperature threshold, and increasing the ON/OFF cycle ratio as the second temperature increases;
- and
- after performing the pulsed operation of the pump and the repeating the pulsed operation of the pump, switching the pump ON continuously such that the water is conveyed through the continuous flow heater to the brewing chamber when the first temperature of the water between the continuous flow heater and the brewing chamber is greater than the predefined temperature threshold.
Dependencies are inferred from the claim text.