System and method for forecasting the composition of an outbound train in a switchyard
AssigneeCanadian National Railway Company
InventorsKari Muinonen, Vincent Morency, Matthew Barker
Life of this patent
Estimating the term…
Loading patent…
AssigneeCanadian National Railway Company
InventorsKari Muinonen, Vincent Morency, Matthew Barker
Estimating the term…
A system for forecasting the outbound workload in a switchyard. The system has a processing entity for which receives information on railcar traffic for handling by the switchyard, wherein the railcar traffic includes railcars that are yet to be switched into classification tracks of the switchyard. For every departure train of two or more departure trains, the processing entity applies logic rules to the information to compute a forecast of railcar traffic that will be available to the departure train for transport out of the switchyard. An output releases data derived from the forecast of railcar traffic, describing the traffic available for each train of the two or more departure trains.
A method for building departure trains in a switchyard having a switch, said method comprising:
A method for building departure trains in a switchyard including a switch and classification tracks, said method comprising:
A method for forecasting the outbound workload in a switchyard including a switch and classification tracks, said method comprising:
Dependencies are inferred from the claim text.