Effective cycle time management employing a multi-horizon model
AssigneeInternational Business Machines Corporation
InventorsSoumyadip Ghosh, Jayant R. Kalagnanam, Dmitriy Katz-Rogozhnikov, James R. Luedtke
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsSoumyadip Ghosh, Jayant R. Kalagnanam, Dmitriy Katz-Rogozhnikov, James R. Luedtke
Estimating the term…
Cycle time and throughput of a manufacturing facility is effectively manages by a control system that employs a combination of a long-term horizon model and at least one short-term horizon model to generate control signals for a set of machines in a manufacturing facility. The long-term horizon model determines long-term average time allocation percentage for each machine for a given set of throughput targets and cycle time targets for products to be manufactured. Each of the at least one short-term horizon model determines queues for immediate use at processing tools, while the queues are subjected to a secondary adjustment based on the time allocation constraints generated by the long-term horizon model. The combination of the long-term and the at least one short-term horizon models provides a stable long-term proactive WIP bubble-management as well as short-term WIP bubble management.
A system for providing control signals for operation of a plurality of machines in a manufacturing facility, said system comprising a computer and a communication means, wherein said computer is configured to perform the steps of:
A method for providing control signals for operation of a plurality of machines in a manufacturing facility, said method comprising:
A computer program product for providing control signals for operation of a plurality of machines in a manufacturing facility, the computer program product comprising a computer readable storage non-transitory medium having computer readable program code embodied therewith, wherein said computer readable program code is configured to perform the steps of:
Dependencies are inferred from the claim text.