A wind farm in which electrical power produced in the wind farm is transported via a wind-farm-internal network to a substation. Upon being transferred to an external network, the electrical power is transformed to a voltage which is higher by a selectable step-up ratio than the voltage in the wind-farm-internal network. The electrical load level on a wind energy installation in the wind farm is determined, and the step-up ratio is adjusted as a function of the electrical load level. Accordingly, it is possible to influence the voltage in the wind-farm-internal network such that the wind energy installations are subject to a lower electrical load level.
Claims14
A method for operating a wind farm, in which electrical power produced in the wind farm is transported via a wind-farm-internal network to a substation and in which, before being transferred to an external network, the electrical power is transformed to a voltage which is higher by a selectable step-up ratio than the voltage in the wind-farm-internal network, the method comprising:
- determining an electrical load level on a wind energy installation in the wind farm;
- determining a wattless component margin between the electrical load level and the system limits of the wind energy installation;
- and
- adjusting the step-up ratio as a function of whether the predetermined wattless component margin is maintained.
A wind farm, comprising:
- a wind energy installation;
- a substation at which electrical power produced in the wind farm is transmitted from a wind-farm-internal network to an external network;
- a stepping switch configured to adjust a step-up ratio between a voltage in the wind-farm-internal network and a voltage in the external network;
- and
- a wind farm regulator configured to preset the step-up ratio on the stepping switch as a function of whether a predetermined wattless component margin between an electrical load level on the wind energy installation and the system limits of the wind energy installation is maintained.