# US 8,280,660 B2 · Electrical distribution networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,280,660 B2
- Document ID: US8280660B2
- Status: Granted
- Kind: B2
- Application number: 12/309,608
- Filed: 2007-07-24
- Published: 2009-11-26
- Granted: 2012-10-02
- Earliest claimed: 2006-08-24
- Assignees: ROLLS-ROYCE plc
- Inventors: Matthew Ingham; David R. Trainer; Stuart J. Galloway; Adam Dysko
- Web page: https://patentgrep.com/patent/US8280660B2

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 2105/50: for selectively controlling the operation of the loads
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Previously, electrical power systems have been analyzed to provide theoretical fault levels values for different zones of an electrical power distribution system based upon a worse case scenario. However, existing electrical loads will in practice provide a more adaptable and higher fault level. By monitoring and identifying an I-V characteristic upon switching electrical load in practical operation an actual default level at particular nodes in a power distribution system is determinable. In such circumstances decisions with regard to the connectability of further electrical generators or loads at particular parts and zones of an electrical power distribution system can be quantified by reference to the actual fault level rather than the theoretical worse case scenario level and therefore avoid unnecessary upgrading of transmission equipment or denying access to the electrical power system.

## Claims

### Claim 1

A method of operating an electrical distribution network having at least one electrical power generator, the method comprising:
a) defining a node within a zone of the electrical distribution network;
b) using a meter to measure voltage and current at the node to determine a Current-Voltage characteristic (I-V characteristic) at the node over an electrical load change; and
c) utilising the I-V characteristic to determine a fault level for the zone of the electrical distribution network.

### Claim 2 (depends on 1)

The method of claim 1, wherein the I-V characteristic is periodically determined for a subsequent operational time period.

### Claim 3 (depends on 1)

The method of claim 1, wherein the I-V characteristic is substantially dynamically determined.

### Claim 4 (depends on 1)

The method of claim 1, wherein at least the node is at a connection for the electrical power generator to the network.

### Claim 5 (depends on 1)

The method of claim 1, the method further comprising:
an adjustment step to alter at least one of the network and the generator depending on the fault level determined.

### Claim 6 (depends on 5)

The method of claim 5, wherein the adjustment step includes altering connections in the network.

### Claim 7 (depends on 5)

The method of claim 5, wherein the adjustment step includes switching off or disconnecting or de-rating the electrical generator.

### Claim 8 (depends on 1)

The method of claim 1, wherein the zone of the electrical distribution network includes an electrical bus bar.

### Claim 9 (depends on 8)

The method of claim 8, wherein the zone includes an electrical bus bar not directly connected to the generator.

### Claim 10 (depends on 1)

The method of claim 1, the method further comprising:
providing an indicator of fault level.

### Claim 11 (depends on 10)

The method of claim 10, wherein the indicator includes an indication of the value of the fault level.

### Claim 12 (depends on 10)

The method of claim 10, wherein the indicator provides an indication of whether the fault level exceeds a desired value.

### Claim 13 (depends on 10)

The method of claim 10, wherein the indicator provides an indication of whether the fault level exceeds a safe value.

### Claim 14 (depends on 10)

The method of claim 10, wherein the indicator provides an indication of the fault level stability in terms of a time period for which the fault level has remained stable.

### Claim 15 (depends on 1)

The method of claim 1, wherein step b) includes measuring the voltage and current at the node before the load change to provide a first point on the I-V characteristic and measuring the voltage and current at the node after the load change to provide a second point on the I-V characteristic.

### Claim 16 (depends on 15)

The method of claim 15, wherein step b) includes measuring the voltage and current at the node before and after each of a plurality of load changes to provide a plurality of points on the I-V characteristic.

### Claim 17 (depends on 15)

The method of claim 15, wherein step b) includes connecting an electrical load to the node to produce a load change, measuring the voltage and current at the node before the electrical load is connected to the node to produce the load change to provide a first point on the I-V characteristic, and measuring the voltage and current at the node after the electrical load is connected to the node to produce the load change to provide a second point on the I-V characteristic.

### Claim 18 (depends on 17)

The method of claim 17, wherein step b) includes measuring the voltage and current at the node before and after each of a plurality of electrical loads are connected to the node to produce a plurality of load changes to provide a plurality of points on the I-V characteristic.

### Claim 19 (depends on 1)

The method of claim 1, wherein step b) includes changing the excitation of at least one electrical power generator connected to the electrical distribution network to provide a change in current.

### Claim 20

A monitor for an electrical distribution network comprising:
a connector for coupling in use to a node within a zone of an electrical distribution network;
a sensor that is configured to measure the voltage and current at the node and to determine a Current-Voltage characteristic (I-V characteristic) for the node from the voltage and current upon an electrical load change; and
a processor to receive the I-V characteristic and determine a fault level for the zone.

### Claim 21 (depends on 20)

The monitor of claim 20, wherein the monitor includes a timer.

### Claim 22 (depends on 21)

The monitor of claim 21, wherein the timer is configured to periodically determine the I-V characteristic and so the fault level.

### Claim 23 (depends on 20)

The monitor of claim 20, wherein the monitor is configured to dynamically determine the I-V characteristic and so the fault level.

### Claim 24 (depends on 20)

An electrical power distribution network comprising:
the monitor of claim 20, and
a plurality of generators and/or electrical connectors, wherein
the monitor is connected within the network at a predetermined node for a zone of the electrical distribution network.

### Claim 25 (depends on 24)

The network of claim 24, wherein the network includes switches to alter at least one of the network and one or more generators depending on the fault level determined.

### Claim 26 (depends on 25)

The network of claim 25, wherein the switches are configured to adjust and alter connections in the network to change the fault level.

### Claim 27 (depends on 25)

The network of claim 25, wherein the switches are configured to disconnect at least one generator from the network to vary the fault level.

### Claim 28 (depends on 24)

The network of claim 24, wherein the network includes an adjuster mechanism that is configured to alter at least one generator in terms of output to change the fault level.

### Claim 29 (depends on 24)

The network of claim 24, wherein the zone includes an electrical bus bar.

### Claim 30 (depends on 24)

The network of claim 24, wherein the electrical distribution network includes a plurality of zones.

### Claim 31 (depends on 30)

The network of claim 30, wherein at least one zone of the plurality of zones includes an electrical bus bar that is not directly connected to a generator.

### Claim 32 (depends on 24)

The network of claim 24, wherein the electrical power generator includes an electrical load change mechanism.

### Claim 33 (depends on 32)

The network of claim 32, wherein the electrical load change mechanism is configured to adjust the excitation level within an electrical power generator to vary its output and therefore alter the load within the network.

### Claim 34 (depends on 20)

The monitor of claim 20, wherein the sensor is configured to measure the voltage and current at the node before the load change to provide a first point on the I-V characteristic and the sensor is configured to measure the voltage and current at the node after the load change to provide a second point on the I-V characteristic.

### Claim 35 (depends on 34)

The monitor of claim 34, wherein the sensor is configured to measure the voltage and current at the node before and after each of a plurality of load changes to provide a plurality of points on the I-V characteristic.

### Claim 36

A method of operating an electrical distribution network having at least one electrical power generator, the method comprising:
a) defining a node within a respective zone of the electrical distribution network,
b) using a meter to measure voltage and current at the node during normal operating conditions of the electrical distribution network to determine a Current-Voltage characteristic (I-V characteristic) at the node over a load change, and
c) utilising the I-V characteristic to determine a fault level for the zone of the electrical distribution network.