# US 8,276,713 B2 · Method of building liquid tank using movable scaffolding

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 8,276,713 B2
- Document ID: US8276713B2
- Status: Granted
- Kind: B2
- Application number: 11/682,134
- Filed: 2007-03-05
- Published: 2007-09-06
- Granted: 2012-10-02
- Earliest claimed: 2006-03-03
- Assignees: Korea Gas Corporation
- Inventors: Young Myung Yang; Seong Ho Hong; Ihn Soo Yoon; Young Chul Yang; Heung Seok Seo; Ji Hun Kim; Byoung Taek Oh; Young Kyun Kim
- Web page: https://patentgrep.com/patent/US8276713B2

## CPC

- E04G 3/28: Mobile scaffolds; Scaffolds with mobile platforms {(movable inspection or maintenance platforms for bridges E01D19/106, lifting devices for movable platforms, e.g. on vehicles B66F11/04)}
- E04G 3/24: specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons (E04G3/28 takes precedence; {E04G1/362, E04G3/305 take precedence; scaffolding usable on slipways and in dry docks B63C5/02})
- B63C 5/02: Stagings; Scaffolding; Shores or struts
- B63C 2005/025: {Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls}
- E04G 2003/283: {mobile horizontally}
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- B63C: LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS (floating nets, floating slipways, or the like for recovering aircraft from the water B63B35/52)

## Abstract

Disclosed is a scaffold installed within a large structure such as a pressure vessel or a tank of a ship, and an insulation system construction method using the same. The scaffold for use in performing desired work within a large structure includes a supporting structure installed adjacent to both side surfaces and a top surface of the large structure, and a carrying unit installed movable along the supporting structure to allow materials to be carried or to provide a working space for a worker thereon, wherein the supporting structure is installed to be movable along a wall surface of the large structure.

## Claims

### Claim 1

A method of building a liquid tank, the method comprising:
providing a structure comprising a plurality of walls, which define an interior space, the plurality of walls comprising a first sidewall, a second sidewall, and a top wall;
installing a first insulation module on the first sidewall;
installing a plurality of guide rails extending in a first direction within the interior space, wherein a first one of the plurality of guide rails is installed over the first insulation module such that the first insulation module is interposed between the first guide rail and the first sidewall;
providing a scaffolding within the interior space;
engaging the scaffolding with the guide rails such that the scaffolding is slidable within the interior space along the guide rails;
sliding the scaffolding within the interior space along the guide rails;
installing second insulation modules over the first sidewall and next to the first insulation module, thereby building an insulation wall structure on the first sidewall, wherein the insulation wall structure comprises the first insulation module and the second insulation modules; and
subsequent to building the insulation wall structure, removing the guide rails from the interior space,
wherein the first insulation module is installed before engaging the scaffolding with the guide rails, wherein the second insulation modules are installed after engaging the scaffolding with the guide rails.

### Claim 2 (depends on 1)

The method of claim 1, providing the scaffolding comprises building the scaffolding within the interior space.

### Claim 3 (depends on 1)

The method of claim 1, further comprising removing the scaffolding from the interior space.

### Claim 4 (depends on 1)

The method of claim 1, wherein the top wall interconnects the first sidewall and the second sidewall which generally opposes the first sidewall, wherein the first sidewall, the second sidewall and the top wall together define the interior space.

### Claim 5 (depends on 4)

The method of claim 4, wherein the insulation wall structure is formed on the first sidewall, wherein the insulation wall structure comprises a metallic plate and an insulation material interposed between the metallic plate and the first sidewall, wherein the metallic plate comprises a plurality of metallic pieces that are liquid tightly coupled together so as to form the metallic plate.

### Claim 6 (depends on 4)

The method of claim 4, wherein the first sidewall comprises two or more sidewall sections, each of which comprises an interior surface, wherein the interior surfaces of the two or more sidewall sections are angled with each other.

### Claim 7 (depends on 4)

The method of claim 4, wherein the top wall comprises two or more top wall sections, each of which comprises an interior surface, wherein the interior surfaces of the two or more top wall sections are angled with each other.

### Claim 8 (depends on 4)

The method of claim 4, wherein the scaffolding comprises a first side section, a second side section and a top section, wherein the top section interconnects the first side section and the second side section generally opposing the first side section.

### Claim 9 (depends on 8)

The method of claim 8, wherein the first side section or the top section comprises two or more segments, each of which extends at an angle with respect to neighboring one thereof.

### Claim 10 (depends on 8)

The method of claim 8, wherein the top section generally extends in a horizontal direction perpendicular to the first direction.

### Claim 11 (depends on 8)

The method of claim 8, wherein the first side section is configured to move substantially parallel to an interior surface of the first sidewall when the scaffolding moves in the first direction.

### Claim 12 (depends on 8)

The method of claim 8, wherein the top section is configured to move substantially parallel to a surface of the top wall when the scaffolding moves in the first direction.

### Claim 13 (depends on 8)

The method of claim 8, further comprising:
providing a carrier configured to transfer a material between the first side section and the top section of the scaffolding; and
moving the carrier relative to the scaffolding.

### Claim 14 (depends on 13)

The method of claim 13, wherein the carrier is configured to move along the top section in a horizontal direction perpendicular to the first direction.

### Claim 15 (depends on 13)

The method of claim 13, further comprising:
providing a second carrier configured to transfer a material between the first side section and the top section of the scaffolding; and
moving the second carrier relative to the scaffolding.

### Claim 16 (depends on 13)

The method of claim 13, wherein the first side section comprises two substantially parallely extending portions, and wherein the carrier is configured to be interposed between the two substantially parallely extending portions.

### Claim 17 (depends on 15)

The method of claim 15, wherein the carrier is configured to move along a first path and the second carrier is configured to move along a second path substantially parallel to the first path.

### Claim 18 (depends on 17)

The method of claim 17, wherein the first and second paths are configured such that the carrier can be interposed between the first sidewall and the second carrier.

### Claim 19 (depends on 4)

The method of claim 4, further comprising:
providing a carrier configured to transfer a worker or a material along a path generally parallel to an interior surface of one of the first sidewall, the second side wall and the top wall; and
moving the carrier along the path.

### Claim 20 (depends on 4)

The method of claim 4, wherein the structure is located on the ground.

### Claim 21 (depends on 20)

The method of claim 20, wherein the first sidewall, the second sidewall, the top wall and the ground define the interior space.

### Claim 22 (depends on 4)

The method of claim 4, wherein the structure comprises a bottom wall opposing to the top wall and connected to the first sidewall, wherein the first sidewall, the second sidewall, the top wall and the bottom wall define the interior space.

### Claim 23 (depends on 5)

The method of claim 5, wherein the insulation wall structure formed on the first sidewall and the top wall comprises metallic interior surfaces.

### Claim 24 (depends on 1)

The method of claim 1, wherein the scaffolding comprises:
a pair of frames interconnected with each other, each frame comprising:
a first side section,
a second side section generally opposing the first side section, and
a top section interconnecting the first side section and the second side section;
a pair of sliding guides, each of which is installed onto each of the frames; and
a carrier configured to slide along the sliding guides for transferring materials move a worker or material between different locations the first side section and the top section of the scaffolding.

### Claim 25 (depends on 24)

The method of claim 24, wherein each of the sliding guides comprises a first side section, a second side section and a top section, which are respectively installed onto the first side section, the second side section and the top section of each of the frames.

### Claim 26 (depends on 24)

The method of claim 24, wherein the sliding guide is located adjacent to a surface of one of the plurality of walls.

### Claim 27 (depends on 8)

The method of claim 8, wherein the top section is located adjacent to the top wall.

### Claim 28 (depends on 8)

The method of claim 8, wherein the scaffolding further comprises a bottom section generally opposing the top section.

### Claim 29 (depends on 8)

The method of claim 8, wherein at least one pair of the guide rails are installed onto two generally opposing surfaces of the interior space, wherein the at least one pair of guide rails installed onto the generally opposing surfaces prevents substantial movement of the scaffolding in a direction extending between the two generally opposing surfaces while sliding the scaffolding along the guide rails.

### Claim 30 (depends on 1)

The method of claim 1, further installing a third insulation module on the first sidewall, wherein a second one of the plurality of guide rails is installed over the third insulation module on the first sidewall such that the third insulation module is interposed between the second guide rail and the first sidewall, wherein the second insulation modules are installed between the first insulation module and third insulation module.

### Claim 31 (depends on 6)

The method of claim 6, wherein the first insulation module is installed on the first sidewall where two sidewall sections connect at an angle therebetween.

### Claim 32 (depends on 1)

The method of claim 1, wherein the first insulation module comprises two thermal insulation layers and a liquid tight material layer.