Sub-network load management for use in recharging vehicles equipped with electrically powered propulsion systems
AssigneeLava Four, LLC
InventorsRichard M. Tyler, Daniel B. McKenna, James M. Graziano
Life of this patent
Estimating the term…
Loading patent…
AssigneeLava Four, LLC
InventorsRichard M. Tyler, Daniel B. McKenna, James M. Graziano
Estimating the term…
The E-Grid Sub-Network Load Manager operates to regulate the demands presented by the vehicles to the associated Sub-Network thereby to spread the load presented to the service disconnect over time to enable the controllable charging of a large number of vehicles. The load management can be implemented by a number of methodologies, including: queuing requests and serving each request in sequence until satisfaction; queuing requests and cycling through the requests, partially serving each request, then proceeding to the next until the cyclic partial charging service has satisfied all requests; ordering requests pursuant to a percentage of recharge required measurement; ordering requests on an estimated connection time metric; ordering requests on a predetermined level of service basis; and the like. It is evident that a number of these methods can be concurrently employed thereby to serve all of the vehicles in the most efficient manner that can be determined.
A system for controllably providing power to recharge a plurality of vehicles, each of which includes a propulsion system powered, at least in part, by electric power, at least some of which is stored onboard the vehicle in an electric power storage apparatus, comprising:
A method for controllably providing power to recharge a plurality of vehicles, each of which includes a propulsion system powered, at least in part, by electric power, at least some of which is stored onboard the vehicle in an electric power storage apparatus, comprising:
Dependencies are inferred from the claim text.