Floor slab penetration structure and floor slab penetration hole repair method
AssigneeToshiba Plant Systems & Services Corporation
InventorIsao Hoshi
Life of this patent
Estimating the term…
Abstract
As a temporary drainage equipment, a penetration hole is formed to a floor slab of a building under construction, the penetration hole is provided with a substantially cylindrical funnel portion opened to a floor surface of a room, a connection pipe is communicated to a bottom portion of the funnel portion, and a hose guide pipe is inserted to the lower end portion of the connection pipe. An inner flange portion is provided to the lower end portion of the hose guide pipe so as to be flush with a ceiling surface of the downfloor room.
Claims6
A floor slab penetration structure, comprising:
- a penetration hole formed to a floor slab of a building so as to penetrate the floor slab, the penetration hole being provided with a stepped funnel portion, which has substantially a cylindrical shape and opened to a floor slab surface of the building;
- a connection pipe communicated with a bottom portion of the funnel portion of the penetration hole, the connection pipe having an upper end disposed below the floor slab surface;
- a hose guide pipe inserted into a lower end of the connection pipe so as to be communicated therewith;
- and
- an inner flange portion formed to be substantially flush with a lower surface of the floor slab so as to extend inward of the hose guide pipe to abut against and support a lower end of the hose guide pipe so as to extend inward thereof.
A method of repairing a penetration hole of a floor slab penetration structure provided with:
- a penetration hole formed to a floor slab of a building so as to penetrate the floor slab, the penetration hole being provided with a stepped funnel portion, which has substantially a cylindrical shape and opened to a floor slab surface of the building;
- a connection pipe communicated with a bottom portion of the funnel portion of the penetration hole, the connection pipe having an upper end disposed below the floor slab surface;
- a hose guide pipe inserted into a lower end of the connection pipe so as to be communicated therewith;
- and
- an inner flange portion formed to be substantially flush with a lower surface of the floor slab so as to extend inward of the hose guide pipe to abut against and support a lower end of the hose guide pipe so as to extend inward thereof, the repairing method comprising the steps of:
- preparing a penetration hole closing member to be inserted into the penetration hole to close the penetration hole;
- inserting the penetration hole closing member into the connection pipe disposed in to the penetration hole so as to abut against the inner flange portion to thereby close the penetration hole;
- and
- pouring a repairing material into the floor slab penetration hole from the funnel portion thereof.
Dependencies are inferred from the claim text.