Power management of network-connected devices in peak power periods
AssigneeSharp Laboratories of America, Inc.
InventorAndrew Rodney Ferlitsch
Life of this patent
Estimating the term…
Loading patent…
AssigneeSharp Laboratories of America, Inc.
InventorAndrew Rodney Ferlitsch
Estimating the term…
A system and method are provided for managing network-connected devices in peak power periods. The method establishes a network of connected devices, identifying a first device in the network as an off-peak device, and a second device as a peak device. If a peak power warning signal is detected, the off-peak device is disabled, but not the peak device. Any job destined for the off-peak device from a source device is relayed to the peak device and processed by the peak device. If the job destined for the off-peak device is a job format associated with the off-peak device, relaying the job to the peak device may further include the operation of converting the job to a job format associated with the peak device. In one aspect, a destination change message is sent to the source device, indicating the location of the peak device processing the job.
A method for managing network-connected devices in peak power periods, the method comprising:
A system for managing network-connected devices in peak power periods, the system comprising:
Dependencies are inferred from the claim text.