Installation for producing cement clinker, and method for operating one such installation
AssigneeKHD Humboldt Wedag GmbH
InventorsHeiko Schürmann, Carsten Eckert
Life of this patent
Estimating the term…
Loading patent…
AssigneeKHD Humboldt Wedag GmbH
InventorsHeiko Schürmann, Carsten Eckert
Estimating the term…
A cement clinker production line with a calcining stage connected upstream of the rotary tubular kiln including an integrated calcining combustion chamber, with a CO-containing reduction zone whose size and reduction potential can be adapted to different NOx contents contained in the kiln exhaust gas and/or different types of secondary fuels used in the combustion chamber. The combustion chamber has an upper, raw-meal-free reducing zone with a feed for secondary fuels, and first tertiary partial airstream with sub-stoichiometric fuel combustion for gasifying the secondary fuels. The combustion chamber has a lower zone. The inflow for at least one raw meal partial stream and one second tertiary partial airstream are arranged in the junction region of the upper zone and the lower zone. The height (H) of the upper zone in relation to the height (h) of the lower zone has a ratio of approximately 5:1 to approximately 1:1.
An installation for manufacturing cement clinker from raw meal which is treated thermally in a combustion process by preheating, calcining, sintering and cooling stages, with an exhaust gas stream of the sintering stage and an exhaust gas stream of the cooling stage in the calcining stage which is supplied with fuel is used to calcine the raw meal, including a calcining combustion chamber with secondary fuel introduced into an upper side of the chamber and a tertiary partial airstream with sub-stoichiometric fuel combustion being integrated in the calcining stage in order to form a CO-containing reduction zone for reducing a pollutant NOx, and an underside of the combustion chamber being connected via a connecting line to a lower region of a rotary kiln exhaust gas rising line, comprising:
An installation for manufacturing cement clinker from raw meal which is treated thermally in a combustion process by preheating, calcining, sintering and cooling stages, comprising:
A method for operating an installation for manufacturing cement clinker from raw meal which is treated thermally in a combustion process by preheating, calcining, sintering and cooling stages, with an exhaust gas stream of the sintering stage and an exhaust gas stream of the cooling stage in the calcining stage which is supplied with fuel being arranged and directed to calcine the raw meal, a calcining combustion chamber having an upper raw-meal-free reducing zone with a feed for secondary fuel arranged at the upper side of the combustion chamber, a first tertiary partial airstream with sub-stoichiometric fuel combustion being integrated in the calcining stage in order to form a CO-containing reduction zone to reduce a pollutant NOx and to gasify the secondary fuel, and an underside of the combustion chamber being connected via a connecting line to a lower region of a rotary kiln exhaust gas rising line, the combustion chamber having a lower zone, an inflow of at least one raw meal partial stream and of a second tertiary partial air stream being arranged in a junction region between the upper raw-meal-free, reducing zone and the lower zone, a height of the upper, raw-meal-free zone of the combustion chamber in relation to a height of the lower zone having a ratio of 5:1 to 1:1, and a third tertiary partial airstream line and a second raw meal partial stream passing into the rotary kiln exhaust gas rising line above a junction of a combustion chamber connecting line and the rotary kiln exhaust gas rising line in the upper region of the combustion chamber, and wherein each of the three tertiary partial airstream lines is assigned an actuating element for regulating a respective tertiary air flow rate, the method comprising: