Methods and systems for completing multi-zone openhole formations
AssigneeSchlumberger Technology Corporation
InventorAnwar Ahmed Maher Assal
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchlumberger Technology Corporation
InventorAnwar Ahmed Maher Assal
Estimating the term…
Methods and systems for completing multi-zone formations. The method can include placing a gravel pack assembly within a borehole. The gravel pack assembly can include a first sand control extension. A first sand control screen can be disposed adjacent the first sand control extension. The first sand control extension can have a flowpath that is selectively opened and closed. A first isolation packer can be disposed adjacent the first sand control screen. A second isolation packer can be disposed adjacent the first isolation packer. A second sand control extension can be disposed adjacent the second isolation packer. The second sand control extension can include at least a second flowpath that is selectively opened and closed. A second sand control screen can be disposed adjacent the second sand control extension. A lower seal can be disposed adjacent the second sand control screen.
A method for completing multi-zone, openhole formations, comprising:
A method for completing multi-zone, openhole formations, comprising:
Dependencies are inferred from the claim text.