Two global precise times for synchronization
AssigneeVestas Wind Systems A/S
InventorJohn Bengtson
Life of this patent
Estimating the term…
Loading patent…
AssigneeVestas Wind Systems A/S
InventorJohn Bengtson
Estimating the term…
Method of controlling a wind power system comprising a plurality of system elements, the wind power system including a plurality of data processors distributed in the system elements, the method includes the steps of: synchronizing at least a part of the data processors to at least one reference signal distributed to the data processors from a time synchronization arrangement, associating the data processors with local clock generation circuitries, wherein the local clock generation circuitries associated with data processors of a first subset of the data processors have a peak-to-peak tracking jitter higher than or equal to a predetermined threshold value and wherein a second subset of the data processors have a peak-to-peak tracking jitter less than the predetermined threshold value, controlling at least one of said system elements at least partly by mechanism of a data processor from said first or second subset of data processors.
A method of controlling a wind power system comprising a plurality of system elements, said wind power system including a plurality of data processors distributed in said system elements, the method comprising the steps of:
A system for controlling a wind power system comprising a plurality of system elements, said wind power system including a plurality of data processors distributed in said system elements, comprising:
Dependencies are inferred from the claim text.