# US 7,972,080 B2 · Bank-sided porosity storage reservoirs

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 7,972,080 B2
- Document ID: US7972080B2
- Status: Granted
- Kind: B2
- Application number: 12/049,049
- Filed: 2008-03-14
- Published: 2008-09-18
- Granted: 2011-07-05
- Earliest claimed: 2007-03-14
- Assignees: PS Systems Inc.
- Inventors: Donald O. Summers; Stanley R. Peters
- Web page: https://patentgrep.com/patent/US7972080B2

## CPC

- B65G 5/00: Storing fluids in natural or artificial cavities or chambers in the earth
- B65G: TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS (packaging B65B; handling thin or filamentary materials, e.g. paper sheets or thread, B65H; cranes B66C; portable mobile or lifting or hauling appliances, e.g. hoists, B66D; devices for lifting or lowering goods for loading or unloading purposes, e.g. fork-lift trucks, B66F9/00; emptying bottles, jars, casks, barrels or similar containers, not otherwise provided for, B67C9/00; delivering or transferring liquids B67D; filling or discharging vessels for liquefied, solidified or compressed gases F17C; pipe-line systems for fluids F17D)

## Abstract

Natural soils and underlying bedrock typical of channel banks near a river and floodplain system are utilized to improve the economics and efficiency of constructing an underground porosity storage reservoir. A man-made barrier, typically a slurry wall, is keyed into these banks and forms a first portion of a closed boundary for the reservoir. The channel banks between the two ends of the slurry wall form a substantially impermeable natural barrier defining a second portion of the closed boundary for the reservoir, thereby reducing the construction costs on sites appropriate for such a design. Locating the bank-sided porosity storage reservoir over naturally occurring scour regions in the bedrock can greatly increase the storage capacity. By building an embankment and extending the slurry walls higher, an open water storage area can be created on top of the reservoir that is bounded by the elevated slurry wall and the channel bank.

## Claims

### Claim 1

A method for storing water in underground alluvial deposits, the method comprising the steps of:
(a) constructing underground a first substantially impermeable man-made barrier defining a first portion of a closed boundary for a bank-sided porosity storage reservoir, wherein the first substantially impermeable man-made barrier extends from a surface level into an aquiclude beneath the underground alluvial deposits so that a bottom surface of the first substantially impermeable man-made barrier is keyed into the aquiclude to form a substantially impermeable water seal between the first substantially impermeable man-made barrier and the aquiclude;
(b) keying a first end of the first substantially impermeable man-made barrier into a natural soils and/or bedrock of a natural channel bank at a first location; and
(c) keying a second end of the first substantially impermeable man-made barrier into the natural soils and/or bedrock of the natural channel bank at a second location, wherein the natural channel bank located between the first and second ends of the first substantially impermeable man-made barrier forms a substantially impermeable natural barrier, wherein the substantially impermeable natural barrier defines a second portion of the closed boundary for the bank-sided porosity storage reservoir that encloses the underground alluvial deposits;
whereby the underground alluvial deposits within the closed boundary are hydraulically separated from underground alluvial deposits outside of the closed boundary but hydraulically connected via the natural channel bank to natural groundwater within the natural channel bank.

### Claim 2 (depends on 1)

The method according to claim 1 further comprising the step of: alternately introducing and removing the underground alluvial deposits with water.

### Claim 3 (depends on 1)

The method according to claim 1 wherein said keying steps (b) and (c) further comprise the step of: keying the first and second ends of the first substantially impermeable man-made barrier at a bedrock scour line, wherein the substantially impermeable natural barrier between the first and second ends of the first substantially impermeable man-made barrier follows the bedrock scour line,

### Claim 4 (depends on 1)

The method according to claim 1 wherein said constructing step (a) further comprises the step of:
constructing the first substantially impermeable man-made barrier around the underground alluvial deposits encompass one or more scour zones located in the bedrock below the underground alluvial deposits.

### Claim 5 (depends on 1)

The method according to claim 1 wherein said constructing step (a) further comprises the step of:
constructing the first substantially impermeable man-made barrier in a shape that is a one of an arc shape, an oval shape, an irregular shape, a one-sided shape, a two-sided shape, a three-sided shape, and an n-sided shape.

### Claim 6 (depends on 1)

The method according to claim 1 further comprising the steps of:
building an embankment coincident with where the first substantially impermeable man-made barrier will be constructed;
constructing the first substantially impermeable man-made barrier to extend through the embankment and down into the aquiclude, wherein an open water storage is created above the underground alluvial deposits and bounded by the first substantially impermeable man-made barrier and the channel bank; and
alternately extracting and recharging the open water storage with water.

### Claim 7 (depends on 1)

The method according to claim 1 wherein said keying steps (b) and (c) further comprise the step of:
when the bedrock located at the first and second locations is falling in elevation away from the underground alluvial deposits, extending the first and second ends of the first substantially impermeable man-made barrier a certain distance for keying into the natural soils and/or bedrock to achieve an acceptable water migration rate.

### Claim 8 (depends on 1)

The method according to claim 1 wherein said first substantially impermeable man-made barrier is a slurry wall or any other suitable structure that can be keyed into the aquiclude.

### Claim 9 (depends on 1)

The method according to claim 1 further comprising the steps of:
when a gap occurs in the substantially impermeable natural barrier that would not provide consistent substantial impermeability, constructing a second man-made barrier in the gap;
keying a first end of the second man-made barrier into the natural soils and/or bedrock of the channel bank; and
keying a second end of the second man-made barrier into the natural soils and/or bedrock of the channel bank, wherein the second man-made barrier and the substantially impermeable natural barrier on either side of the second man-made barrier, and the first substantially impermeable man-made barrier, enclose the underground alluvial deposits.

### Claim 10

A bank-sided porosity storage reservoir for storing water in underground alluvial deposits comprising:
a first substantially impermeable man-made barrier defining a first portion of a closed boundary for the bank-sided porosity storage reservoir, wherein the first substantially impermeable man-made barrier extends from a surface level into an aquiclude beneath the bank-sided porosity storage reservoir so that a bottom surface of the first substantially impermeable man-made barrier is keyed into the aquiclude to form a substantially impermeable water seal between the first substantially impermeable man-made barrier and the aquiclude; and
a natural channel bank located between a first end and a second end of the first substantially impermeable man-made barrier, wherein the first and second ends of the first substantially impermeable man-made barrier are keyed into a natural soils and/or bedrock of the natural channel bank at a first location and a second location respectfully, wherein the natural channel bank located between the first and second ends of the first substantially impermeable man-made barrier connects the underground alluvial deposits to a natural groundwater regime of natural channel bank, wherein the natural channel bank between the first and second ends defines a second portion of the closed boundary for the bank-sided porosity storage reservoir that encloses the underground alluvial deposits.

### Claim 11 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 further comprising:
a filling and draining system for alternately introducing and removing the underground alluvial deposits with water.

### Claim 12 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 further comprising:
a bedrock scour line, wherein the first and second ends of the first substantially impermeable man-made barrier are keyed at the bedrock scour line, and further wherein the substantially impermeable natural barrier between the first and second ends of the first substantially impermeable man-made barrier follows the bedrock scour line.

### Claim 13 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 further comprising:
a one or more scour zones, wherein the first substantially impermeable man-made barrier is constructed around the underground alluvial deposits to encompass one or more scour zones located in the bedrock below the underground alluvial deposits.

### Claim 14 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 wherein the first substantially impermeable man-made barrier is constructed in a shape that is a one of an arc shape, an oval shape, an irregular shape, a one-sided shape, a two-sided shape, a three-sided shape, and an n-sided shape.

### Claim 15 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 further comprising:
an embankment, wherein the first substantially impermeable man-made barrier extends through the embankment and down into the aquiclude, wherein an open water storage is created above the underground alluvial deposits and bounded by the first substantially impermeable man-made barrier and the channel bank, wherein water is alternately introduced and removed from the open water storage.

### Claim 16 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 wherein the first substantially impermeable man-made barrier is a slurry wall or any other suitable structure that can be keyed into the aquiclude.

### Claim 17 (depends on 10)

The bank-sided porosity storage reservoir according to claim 10 further comprising:
a second man-made barrier constructed when a gap occurs in the substantially impermeable natural barrier that would not provide consistent substantial impermeability, wherein a first end of the second man-made barrier is keyed into the natural soils and/or
bedrock of the channel bank, and a second end of the second man-made barrier is keyed into the natural soils and/or bedrock of the channel bank, wherein the second man-made barrier and the substantially impermeable natural barrier on either side of the second man-made barrier, and the first substantially impermeable man-made barrier, enclose the underground alluvial deposits.

### Claim 18

A bank-sided porosity storage reservoir storing water in underground alluvial deposits made by the process of:
(a) constructing underground a first substantially impermeable man-made barrier defining a first portion of a closed boundary for a bank-sided porosity storage reservoir, wherein the first substantially impermeable man-made barrier extends from a surface level into an aquiclude beneath the underground alluvial deposits so that a bottom surface of the first substantially impermeable man-made barrier is keyed into the aquiclude to form a substantially impermeable water seal between the first substantially impermeable man-made barrier and the aquiclude;
(b) keying a first end of the first substantially impermeable man-made barrier into a natural soils and/or bedrock of a natural channel bank at a first location; and
(c) keying a second end of the first substantially impermeable man-made barrier into the natural soils and/or bedrock of the natural channel bank at a second location, wherein the natural channel bank located between the first and second ends of the first substantially impermeable man-made barrier forms a substantially impermeable natural barrier, wherein the substantially impermeable natural barrier defines a second portion of the closed boundary for the bank-sided porosity storage reservoir that encloses the underground alluvial deposits;
thereby hydraulically separating the underground alluvial deposits within the closed boundary from underground alluvial deposits outside of the closed boundary while maintaining a natural connection to a groundwater regime of the natural channel bank.

### Claim 19 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said process further comprises the step of:
alternately extracting and recharging the underground alluvial deposits with water.

### Claim 20 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said keying steps (b) and (c) of said process further comprise the step of:
keying the first and second ends of the first substantially impermeable man-made barrier at a bedrock scour line, wherein the substantially impermeable natural barrier between the first and second ends of the first substantially impermeable man-made barrier follows the bedrock scour line.

### Claim 21 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said constructing step (a) of said process further comprises the step of:
constructing the first substantially impermeable man-made barrier around the underground alluvial deposits to encompass one or more scour zones located in the bedrock below the underground alluvial deposits.

### Claim 22 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said constructing step (a) of said process further comprises the step of:
constructing the first substantially impermeable man-made barrier in a shape that is a one of an arc shape, an oval shape, an irregular shape, a one-sided shape, a two-sided shape, a three-sided shape, and an n-sided shape.

### Claim 23 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said process further comprises the steps of:
building an embankment coincident with where the first substantially impermeable man-made barrier will be constructed;
constructing the first substantially impermeable man-made barrier to extend through the embankment and down into the aquiclude, wherein an open water storage is created above the underground alluvial deposits and bounded by the first substantially impermeable man-made barrier and the channel bank; and
alternately extracting and recharging the open water storage with water.

### Claim 24 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said keying steps (b) and (c) of said process further comprise the step of:
when the bedrock located at the first and second locations is falling in elevation away from the underground alluvial deposits, extending the first and second ends of the first substantially impermeable man-made barrier a certain distance for keying into the natural soils and/or bedrock to achieve an acceptable water migration rate.

### Claim 25 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein the first substantially impermeable man-made barrier is a slurry wall or any other suitable structure that can be keyed into the aquiclude.

### Claim 26 (depends on 18)

The bank-sided porosity storage reservoir according to claim 18 wherein said process further comprises the steps of:
when a gap occurs in the substantially impermeable natural barrier that would not provide consistent substantial impermeability, constructing a second man-made barrier in the gap;
keying a first end of the second man-made barrier into the natural soils and/or bedrock of the channel bank; and
keying a second end of the second man-made barrier into the natural soils and/or bedrock of the channel bank, wherein the second man-made barrier and the substantially impermeable natural barrier on either side of the second man-made barrier, and the first substantially impermeable man-made barrier, enclose the underground alluvial deposits.
