Thermal management system for a removable build chamber for use with a laser sintering system
Assignee3D Systems, Inc.
InventorsChristian M. Merot, Tae Mark Chung, Raymond J. Bishop
Life of this patent
Estimating the term…
Abstract
A thermal management system is provided to control the preheating and cool down of a removable build chamber in a laser sintering system. A thermal management station controls preheating of a removable build chamber to heat the chamber to a temperature at or near the operating temperature of the laser sintering system. After insertion into the laser sintering system and completion of a build the thermal management station controls the cool down of the part cake within the removable build chamber after the chamber has been removed from the laser sintering system.
Claims5
A method for controlling the temperature of a build chamber used in a laser sintering system comprising the steps of:
- a. connecting a first build chamber to a thermal management station to preheat the build chamber to a temperature at or near an operating temperature of the laser sintering system;
- b. disconnecting the build chamber from the thermal management station and inserting it into the laser sintering system;
- c. operating the laser sintering system to complete a build by forming at least one part in a part cake comprised of fused and unfused powder;
- d. removing the build chamber from the laser sintering system;
- e. connecting the removed build chamber to thermal management station;
- and
- f. controlling the cool down of the build chamber, by monitoring the temperature of the part cake at selected locations about the periphery of the part cake, to lower the temperature of the build chamber and the part cake to a temperature to permit breakout and removal of the at least one part in the part cake.
Dependencies are inferred from the claim text.