Inspection scaffold of large component for boiler and building method thereof
AssigneeHitachi Plant Technologies, Ltd.
InventorsShigeyoshi Kawaguchi, Kazuhito Nakamitsu, Sinnichi Sagawa
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi Plant Technologies, Ltd.
InventorsShigeyoshi Kawaguchi, Kazuhito Nakamitsu, Sinnichi Sagawa
Estimating the term…
A scaffold assembling of a large component for a boiler requiring inspection is not performed by a high-place work but assembled safely and in a short time. The scaffold is assembled to the large component for the boiler supported by a component supporting beam at the ground side before it is attached to a steel frame main-beam 16. Scaffold lifting/supporting beams interposing coil spaces of a superheater 14 are suspended on wires 36 lifted down from spaces of a ceiling tube wall 34 being a horizontal member of the superheater 14. The scaffold lifting/supporting beams 32 are lifted to raise little by lithe within the superheater, and scaffold components are assembled sequentially toward downward. After a required number of steps of scaffolds are assembled, the scaffold lifting/supporting beams 32 are coupled to the ceiling tube wall 34 to be supported. Finally, the superheater 14 is raised by a lifting means to install to the main-beam.
A building method of assembling an inspection scaffold and a large component for a boiler, the inspection scaffold having a plurality of scaffold supporting beams and a plurality of scaffold components, comprising: