Methods and apparatus for enhanced operation of substrate carrier handlers
AssigneeApplied Materials, Inc.
InventorsMichael Teferra, Amitabh Puri, Eric Englhardt
Life of this patent
Estimating the term…
Abstract
Systems, tools, and methods are provided in which a first signal is transmitted from a tool to a Fab indicating that all substrates to be processed have been removed from a specific carrier and that the specific carrier may be temporarily unloaded from a loadport of the tool. A second signal is transmitted from the tool to the Fab indicating that the specific carrier may be returned to the tool. While the carrier is unloaded from the tool, other carriers may be loaded on the vacated loadport. Numerous other features and aspects of the invention are disclosed.
Claims10
A method comprising:
- transmitting a first signal from a tool indicating that all substrates to be processed have been removed from a specific carrier and that the specific carrier may be temporarily unloaded from a loadport of the tool;
- transmitting a second signal from the tool indicating that the specific carrier may be returned to the tool;
- and
- performing a transfer of the carrier based upon the first and second signals;
- wherein performing the transfer is executed by a carrier handler adapted to receive the first and second signals, and operable to remove an empty carrier to make the loadport available for a second carrier.
An apparatus comprising:
- a loadport associated with a tool;
- and
- a communications port adapted to communicate with a Fab including an automated material handling system adapted to load and unload carriers from the loadport and adapted to receive signals from the tool;
- wherein the tool is adapted to:
- transmit a first signal indicating that all substrates to be processed have been removed from a specific carrier and that the specific carrier may be temporarily unloaded from the loadport, and
- transmit a second signal indicating that the specific carrier may be returned to the tool;
- and
- wherein the first and second signals are transmitted to a carrier handler coupled to the tool and adapted to perform a transfer of the carrier, and wherein the carrier handler is operable to remove an empty carrier to make the loadport available for a second carrier.
A method comprising:
- requesting a Fab to temporarily unload a first in-access carrier from a loadport associated with a tool;
- indicating to the Fab a period of time that the first in-access carrier is to be temporarily unloaded from the loadport associated with the tool;
- removing the first in-access carrier from the tool and transferring the first in-access carrier to a storage location;
- loading an unprocessed carrier on the loadport vacated by the first in-access carrier;
- requesting the Fab to load the first in-access carrier to a loadport associated with the tool;
- and
- loading the first in-access carrier to the loadport from the storage location;
- wherein removing and loading the first in-access carrier and unprocessed carriers is executed by a carrier handler adapted to receive the requests, and operable to remove the first in-access carrier to make the loadport available for the unprocessed carrier.
An apparatus comprising:
- a plurality of loadports associated with a tool;
- and
- a controller operative to communicate with a Fab, wherein the controller is adapted to:
- request the Fab to load the first in-access carrier to the loadport associated with the tool;
- and
- request the Fab to temporarily unload a first in-access carrier from a loadport associated with the tool when all unprocessed substrates in the in-access carrier have been removed for processing;
- and
- wherein the controller is further adapted to request the Fab load an unprocessed carrier on the loadport vacated by the first in-access carrier;
- and
- wherein a carrier handler is adapted to execute the load and unload requests, and operable to unload the first in-access carrier to make the loadport available for the unprocessed carrier;
- and
- wherein the controller is further adapted to indicate to the Fab a period of time that the first in-access carrier is to be temporarily unloaded;
- and
- wherein the controller is further adapted to request the Fab load a second in-access carrier on the loadport vacated by the first in-access carrier.
Dependencies are inferred from the claim text.