Managing lost returns in a wellbore
AssigneeExxonMobil Upstream Research Company
InventorsJohn K. Montgomery, Stuart R. Keller, Nancy M. Krahel, Martin V. Smith, Robert S. Williamson
Life of this patent
Estimating the term…
Loading patent…
AssigneeExxonMobil Upstream Research Company
InventorsJohn K. Montgomery, Stuart R. Keller, Nancy M. Krahel, Martin V. Smith, Robert S. Williamson
Estimating the term…
A method of managing lost returns in a wellbore includes contacting a filter cake with a treating fluid to remove metallic weighting agents from the filter cake, wherein the filter cake is disposed on a face of a formation fracture in the wellbore. The method also includes contacting the filter cake with a proppant slurry, wherein the proppant slurry contacts the filter cake concurrently with the treating fluid or after the treating fluid contacts the filter cake. This method may include increasing the filter cake permeability and may utilize a barite removal agent, such as a chelation agent. At least one related wellbore management method creates a fracture in the wellbore and props open the fracture to increase wellbore integrity to utilize higher weight drilling fluids and prevent fractures from forming further down the wellbore.
A method of managing lost returns in a wellbore comprising:
A method of managing drilling operations comprising:
A method of producing hydrocarbons from a well comprising:
Dependencies are inferred from the claim text.