Method and device for maintaining a weft thread which is introduced into a weaving machine, in particular an air-jet weaving machine, after the starting process
AssigneeLindauer Dornier Gesellschaft mbH
InventorsValentin Krumm, Wolfgang Metzler, Dieter Teufel
Life of this patent
Estimating the term…
Abstract
A weaving machine starts-up in slow speed operation during a first weaving cycle following the machine start. To help avoid weft breaks, a method is provided to hold a weft thread inserted into the loom shed during the first weaving cycle. A sensor monitors the weft insertion. The inserted weft thread is held by binding threads at a location downstream from an inlet side of the loom shed, before the weft thread is bound by the warp threads. The binding of the weft thread by the binding threads is carried out dependent on a signal of the sensor.
Claims14
Method of operating a weaving machine, especially an air-jet weaving machine, to produce a woven fabric, said method comprising starting the weaving machine in a starting process, operating the weaving machine in a slow speed running after the starting process during at least a first weaving cycle, inserting a weft thread during the first weaving cycle, monitoring the insertion of the weft thread by at least one sensor and correspondingly producing a signal, holding the inserted weft thread at the outlet side of the loom shed against springing back into the loom shed at least until binding thereof by warp threads, wherein said holding of the inserted weft thread comprises binding the inserted weft thread by separate binding threads temporally before the binding by the warp threads, wherein the binding by the binding threads is carried out spatially at at least one position of the loom shed after the inlet side of the loom shed, and wherein the binding by the separate binding threads is carried out dependent on the signal of the at least one sensor monitoring the insertion of the weft thread.
A method of operating a weaving machine, comprising the steps:
- a) starting said weaving machine from a stop at a machine start time, and operating said weaving machine in a slow speed running operation during a first weaving cycle following said machine start time;
- b) forming an open loom shed of warp threads with said weaving machine during said first weaving cycle;
- c) inserting a weft thread into said open loom shed across said warp threads and progressing downstream from an inlet side to an outlet side of said loom shed during said first weaving cycle;
- d) monitoring said inserting of said weft thread with a sensor of said weaving machine, and providing a signal indicative of said monitoring by said sensor;
- e) after said step c) during said first weaving cycle, holding said weft thread by binding said weft thread with binding threads at at least one location downstream from said inlet side of said loom shed, wherein said binding of said weft thread with said binding threads is carried out dependent on said signal indicative of said monitoring by said sensor;
- and
- f) binding said weft thread with said warp threads by closing said loom shed after said binding of said weft thread with said binding threads, while maintaining said holding of said weft thread at least until said binding of said weft thread with said warp threads.
Dependencies are inferred from the claim text.