Back to results
US 7,604,433 B2Granted
Concrete screed with vertically adjustable gate
AssigneeLaser Strike, LLC
InventorsS. Allen Face, III, Albert D. Frankeny, II
Life of this patent
Estimating the term…
Abstract
A floating screed device has a first section for cutting through plastic concrete and a second section for floating on the plastic concrete. The first and second sections are coupled together by a mechanism that moves the first section relative to the second section in a direction perpendicular to the planar bottom of the second section as the floating screed device is moved through a volume of unfinished plastic concrete.
Claims6
A floating screed device comprising:
- a first section defining a leading edge for cutting through plastic concrete;
- a second section having a planar bottom for floating on the plastic concrete;
- elevation determining means coupled to said second section for determining elevation of said second section relative to a desired finished elevation of the plastic concrete;
- and
- means coupled to said first section and said second section for supporting said first section relative to said second section and for moving said first section relative to said second section in a direction perpendicular to said planar bottom of said second section based on said elevation of said second section relative to the desired finished elevation as said floating screed device is moved through a volume of the plastic concrete that is unfinished with said leading edge defining an initial contact edge between said floating screed device and the volume of the plastic concrete that is unfinished.
2 more elements
A floating screed device comprising:
- an elongated and rigid bar;
- an elongated float having a planar bottom for floating on plastic concrete;
- means coupled to said elongated float for determining elevation thereof relative to a desired finished elevation in the plastic concrete;
- and
- a support and adjustment mechanism coupled to said float, said bar and said means for determining elevation, for positioning said bar in a spaced apart relationship with respect to said float and for moving said bar perpendicularly with respect to said planar bottom of said float based on said elevation of said float relative to the desired finished elevation as said floating screed device is moved through a volume of the plastic concrete that is unfinished with said bar defining an initial contact edge between said floating screed device and the volume of the plastic concrete that is unfinished.
2 more elements
Dependencies are inferred from the claim text.