US 7,546,656 B2Granted
Method of installing prefabricated, segment concrete filled tube members
AssigneeDaewoo Engineering & Construction Co., Ltd.
InventorsSeong-woon Kim, Young-jin Kim, In-gyu Kim, Byeong-moo Jin, Tae-hoon Kim, Hyang-wook Ma, Yun-seok Lee
Life of this patent
Estimating the term…
Abstract
A method of installing segmental concrete filled tube members. The prefabricated segmental concrete filled tube member has a hollow pipe filled therein with concrete, and a connection flange shaped in a ring radially extending from the peripheries of both ends of the pipe, wherein the segmental concrete filled tube member is integrally connected with another adjacent segmental concrete filled tube member by the connection flange.
Claims1
A method of supporting a bridge, comprising the steps of:
- (a) lifting a prefabricated coping part of the upper portion of a bridge pier;
- (b) installing a prefabricated segmental concrete filled tube member under the coping part, the segmental concrete filled tube member including a hollow pipe filled therein with concrete, and a connection flange radially extending from the peripheries of both ends of the pipe;
- (c) installing another prefabricated segmental concrete filled tube member under the former prefabricated segmental concrete filled tube member to connect each other such that the connection flange of the latter segmental concrete filled tube member brings in contact with that of the former segmental concrete filled tube member;
- (d) injecting a filler material into an injection hole formed by grooves provided on opposite surfaces of the connection flanges, respectively;
- and
- (e) repeating the steps (c) and (d).