Floating hydrocarbon treating plant
AssigneeShell Oil Company
InventorsAlan Edgar John Bliault, James Milne Cusiter, Andrew Neil Stephens
Life of this patent
Estimating the term…
Abstract
A floating hydrocarbon treating plant containing a vessel having a hull and a deck and having tanks located below the deck for storing hydrocarbons, and a plant for treating hydrocarbons located at the deck of the vessel is provided. The plant for treating hydrocarbons includes spaced-apart modules, wherein each module has related plant equipment mounted on a module floor, and the modules rest on closed support girders that extend under the module in a direction perpendicular to the edge of the deck, and wherein the module floor is secured to one of the closed support girders.
Claims20
A floating hydrocarbon treating plant comprising a vessel having a hull and a deck and comprising tanks located below the deck for storing hydrocarbons, and a plant for treating hydrocarbons located at the deck of the vessel, wherein the plant for treating hydrocarbons includes spaced-apart modules, wherein each module comprises related plant equipment mounted on a module floor, and the modules rest on at least two closed support girders that extend under the module in a direction perpendicular to the edge of the deck, and wherein the module floor is secured to only one of the closed support girders.
A floating hydrocarbon treating plant comprising a vessel having a hull and a deck and comprising tanks located below the deck for storing hydrocarbons, and a plant for treating hydrocarbons located at the deck of the vessel, wherein the plant for treating hydrocarbons includes spaced-apart modules, wherein each module comprises related plant equipment mounted on a module floor, and the modules rest on at least two closed support girders that extend under the module in a direction perpendicular to the edge of the deck, and wherein the module floor is secured to one of the closed support girders and further comprising a pipe-rack supporting pipes that form the fluid connection between the equipment, which pipe-rack extends along the centreline of the vessel, wherein the modules are arranged at either side of the pipe-rack.
Dependencies are inferred from the claim text.