# US 7,467,161 B2 · Computer system for maintenance resource optimization

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 7,467,161 B2
- Document ID: US7467161B2
- Status: Granted
- Kind: B2
- Application number: 10/147,344
- Filed: 2002-05-15
- Published: 2003-10-02
- Granted: 2008-12-16
- Earliest claimed: 2002-03-27
- Inventors: Franklin Frisina
- Web page: https://patentgrep.com/patent/US7467161B2

## CPC

- G06Q 10/06: Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G05B 19/41865: {characterised by job scheduling, process planning, material flow}
- G05B 2219/31265: Control process by combining history and real time data
- Y02P 90/02: Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
- Y02P 90/80: Management or planning
- Y10S 707/99943: Generating database or data structure, e.g. via user interface
- Y10S 707/99945: Object-oriented database structure processing
- Y10S 707/99948: Application of database or data structure, e.g. distributed, multimedia, or image
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y10S: TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS

## Abstract

A computer based maintenance resource management system has an operations software component with access to historical operations requirements such that job plans for the current operations and safety requirements can be integrated with work orders, allowing operations personnel to review, approve or modify the requirements such that the job plan and work orders can be issued without lost time or productivity as maintenance and operations are fully coordinated.

## Claims

### Claim 1

A computer based maintenance resource management system comprising:
a user accessible computer terminal;
a first software component for creating a job plan including standards;
a second software component for creating a work order;
an integration software component for automatically populating the work order with the job plan;
a third software component for generating a protection request based on the work order for securing the removal of equipment from service and associating the protection request with the work order;
an operation software component for displaying the protection request for approval by a user; and
a user configurable third party interface for enabling third party interaction with the work order.

### Claim 2 (depends on 1)

The maintenance resource management system of claim 1 wherein the integration software component further comprises means for searching data in an equipment database, a preventative maintenance and equipment database, a work order database, a job plan database and an operations database, and means for transferring data to and from the operations database to the second software component.

### Claim 3 (depends on 1)

The maintenance resource management system of claim 1 further comprising a job standards database, accessible via the integration software component.

### Claim 4 (depends on 1)

The maintenance resource management system of claim 1 further comprising at least one table selected from the group consisting of a preventive maintenance and equipment table, a work order table, a schedule table, a calendar table, a job plan table, a lockout table, a preventive maintenance and equipment scheduled activity table, a lockout table, a tag out table, a work order lockout table, a work order precaution table, a work order safety link table, a work order scheduled activity table, a work order tag lock table.

### Claim 5 (depends on 1)

The maintenance resource management system of claim 1 further comprising a database accessible by the integration software component, wherein said database is selected from the group consisting of a job standard database, a job planning database, an operations requirements database and a safety requirement database.

### Claim 6 (depends on 1)

The maintenance resource management system of claim 1 further comprising a management interface for enabling approval of the work order.

### Claim 7

A computer based maintenance resource management system comprising:
a user accessible computer terminal;
a first software component for creating a job plan including standards;
a second software component for creating a work order;
an integration software component for automatically populating the work order with the job plan;
a third software component for generating a protection request based on the work order for securing the removal of equipment from service and associating the protection request with the work order;
an operation software component for displaying the protection request for approval by a user; and
operations safety software that provides instructions for safely removing equipment from service and returning equipment to service.

### Claim 8

A computer based maintenance resource management system comprising:
a user accessible computer terminal;
a first software component for creating a job plan including standards;
a second software component for creating a work order;
an integration software component for automatically populating the work order with the job plan;
a third software component for generating a protection request based on the work order for securing the removal of equipment from service and associating the protection request with the work order;
an operation software component for displaying the protection request for approval by a user; and
means for generating and printing a work order containing details on equipment status, and further containing reference numbers to at least one protection request.

### Claim 9

A method for generating a work order for a maintenance operation comprising:
providing a system including a first software component for creating a job plan including standards; a second software component for creating a work order; an integration software component for automatically populating the work order with the job plan;
wherein said first integration software component includes means for transferring data between the job plan and the work order;
providing a third software component for generating a protection request based on the work order for securing the removal of equipment from service;
providing an operation software component for displaying the protection request for approval by a user; and
providing a user configurable third party interface for enabling third party interaction with the work order.
