Method and apparatus of suspending, completing and working over a well
AssigneeWoodside Energy Limited
InventorsPeter Ernest Page, Alexander Jeffrey Burns, John Edward Niski
Life of this patent
Estimating the term…
Loading patent…
AssigneeWoodside Energy Limited
InventorsPeter Ernest Page, Alexander Jeffrey Burns, John Edward Niski
Estimating the term…
In the various methods of the present invention, reliance is placed on a first and second barrier 26 and 30 respectively positioned in a well 10 to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth of the lowermost end of a completion string when that string is installed in the well 10. By not placing either barrier higher up in the well-bore, both of the barriers can remain in place during suspension and completion and workover operations, thus obviating the need to use a BOP stack to supplement well control. This results in a considerable saving in drill rig time and thus significantly reduces the cost of constructing a well.
A method of completing a sub-sea well using a horizontal christmas tree for production flow control, the horizontal christmas tree having a body, the method comprising the steps of:
A method comprising:
A method comprising:
Dependencies are inferred from the claim text.