Job release with multiple constraints
AssigneeAgency for Science, Technology and Research
InventorsTay Jin Chua, Tian Xiang Cai, Ming Wei William Liu, Feng Yu Wang
Life of this patent
Estimating the term…
Loading patent…
AssigneeAgency for Science, Technology and Research
InventorsTay Jin Chua, Tian Xiang Cai, Ming Wei William Liu, Feng Yu Wang
Estimating the term…
To schedule the release of jobs from a pool of pending jobs, machine information and information about items to be processed are used to determine available machine capacity. Available machine capacity is allocated to jobs subject to multiple job release constraints. Allocation may be performed first for any pending jobs which were partially released during a previous time interval, and then to new jobs in decreasing order of determined job rank. If different operative constraints dictate different numbers of units of a job to be released, the minimum number of units meeting each constraint may be released. After the number of units to be released has been determined for a job, machine information is updated to account for available capacity consumed by the release of the selected number of units of the job. Updated information may be used for job release scheduling of the next job.
A method of scheduling the release of jobs from a pool of pending jobs, the method comprising:
A machine-readable medium including code for scheduling the release of jobs from a pool of pending jobs, comprising:
A computing device comprising a processor and persistent storage memory in communication with said processor storing machine-readable code for directing said device to schedule the release of jobs from a pool of pending jobs, comprising:
Dependencies are inferred from the claim text.