System and Method for Facilitating Managing a Job
AssigneeBellSouth Intellectual Property Corporation
InventorsWilliam M. Seal, Terry L. Small, Carol A. Brechtel, Gail W. Deaton, Ronnie M. Cochran
Life of this patent
Estimating the term…
Loading patent…
AssigneeBellSouth Intellectual Property Corporation
InventorsWilliam M. Seal, Terry L. Small, Carol A. Brechtel, Gail W. Deaton, Ronnie M. Cochran
Estimating the term…
An outside Plant Construction Management (OSPCM) system simplifies and mechanizes many aspects of operating a facility, such as a Regional Bell Operating Company (RBOC). The OSPCM system performs a configuration function and this data is input to the awarded contract which entails breaking the job into its constituent tasks, sequencing the tasks, prioritizing the tasks, and scheduling the tasks. The OSPCM system completes the scheduling task by assigning the tasks to supervisors and/or to outside contractors. The OSPCM system automatically manages the materials required for tasks by determining what and when it is needed, ordering what is available from within inventory, and ordering necessary materials from outside providers. When a task is completed, the contractor accesses the OSPCM system and marks the task as completed. The OSPCM system then forwards invoices to the voucher system for those cases where work is completed as designed.
A system for use in facilitating managing a job, the system comprising:
A computer-implemented method for facilitating managing a job, the method comprising the step of:
Dependencies are inferred from the claim text.