Run-to-run control system and operating method of the same
AssigneeProMOS Technologies Inc.
InventorHung-Wen Chiou
Life of this patent
Estimating the term…
Abstract
A run-to-run control system and a run-to-run controlling method are proposed. The tool process parameters are real-time collected during the semiconductor process is performed and are regarded as the effective factors in the process for providing an optimal operation variables to the tool for the next process run. After modeling the metrology parameters with a set of the tool process parameters with respect to the semiconductor process for its corresponding process run, a set of optimal operation variables is determined by the controller and output to the tool to modify the process recipe of the process. Hence, the process recipe is real-time changed with the process environment to obtain the optimal process performance.
Claims8
A run-to-run control system for controlling a first tool to perform a first semiconductor process for a plurality of process runs, the run-to-run control system comprising:
- means for determining whether a set of metrology parameters of the first process is ready;
- means for receiving a set of tool process parameters of a first process run of the process runs and the set of the metrology parameters when the set of the metrology parameters of the first process run is ready, wherein the set of the metrology parameters characterizes a process performance of the first tool for each process run and the set of the tool process parameters characterizes a process environment during the first semiconductor process performed by the first tool;
- means for determining and updating a modeling set by applying the set of metrology parameters and the set of the tool process parameters to a multi-variable modeling function;
- means for determining a set of optimal operation variables for the first tool for a second process run posterior to the first process run by applying at least a control rule to the modeling set;
- and
- means for providing the set of optimal operation variables to the first tool for processing the second process run.
A method for run-to-run controlling a first tool to perform a first semiconductor process for a plurality of process runs, the method comprising:
- determining whether a set of metrology parameters of the first process run is ready;
- receiving a set of tool process parameters of a first process run of the process runs and the set of the metrology parameters when the set of the metrology parameters of the first process run is ready, wherein the set of the metrology parameters characterizes a process performance of the first tool for each process run and the set of the tool process parameters characterizes a process environment during the first semiconductor process is performed by the first tool;
- determining and updating a modeling set by applying the set of metrology parameters and the set of the tool process parameters to a multi-variable modeling function;
- determining a set of optimal operation variables for the first tool for a second process run posterior to the first process run by applying a plurality of control rules to the modeling set;
- and
- providing the set of optimal operation variables to the first tool for processing the second process run.
Dependencies are inferred from the claim text.