Cascaded control of an average value of a process parameter to a desired value
AssigneeALSTOM Technology Ltd
InventorsScott A. Boyden, Stephen Piche
Life of this patent
Estimating the term…
Loading patent…
AssigneeALSTOM Technology Ltd
InventorsScott A. Boyden, Stephen Piche
Estimating the term…
At least one of the multiple process parameters (MPPs) is a controllable process parameter (CTPP) and one is a targeted process parameter (TPP). The process also has a defined target limit (DTV) representing a first limit on an actual average value (AAV) of the TPP. A first logical controller predicts future average values (FAVs) of the TPP based on the AAVs of the TPP over a first prior time period and the DTV. A second logical controller establishes a further target limit (FTV) representing a second limit on the AAV of the TPP based on one or more of the predicted FAVs, and also determines a target set point for each CTPP based on the AAVs of the TPP over a prior time period and the FTV. The second logical controller directs control of each CTPP in accordance with the determined target set point.
A multi-tier controller for directing operation of a system performing a process, having multiple process parameters (MPPs), at least one of the MPPs being a controllable process parameter (CTPP) and one of the MPPs being a targeted process parameter (TPP), and having a defined target value (DTV) representing a first limit on an actual average value (AAV) of the TPP over a defined time period of length TPLAAV2, with the AAV computed based on actual values (AVs) of the TPP over the defined period, comprising:
A controller for directing operation of a system performing a process, the process having multiple process parameters (MPPs), including at least one controllable process parameter (CTPP) and at least one targeted process parameter (TPP), and having a defined target value (DTV) representing a first limit on an actual average value (MV) of the TPP over a time period (TP), comprising:
A method for directing performance of a process, having multiple process parameters (MPPs), at least one of the MPPs being a controllable process parameter (CTPP) and one of the MPPs being a targeted process parameter (TPP), and having a defined target value (DTV) representing a first limit on an actual average value (AAV) of the TPP over a defined time period of length TPLAAV2, with the MV computed based on actual values (AVs) of the TPP over the defined period, comprising:
A method for directing control of the performance of a process, the process having multiple process parameters (MPPs), including at least one controllable process parameter (CTPP) and at least one targeted process parameter (TPP), and having a defined target value (DTV) representing a first limit on an actual average value (AAV) of the TPP over a time period (TP), comprising:
Dependencies are inferred from the claim text.