A hybrid arched overfilled structure includes a combination of pre-cast side elements and at least one cast-in-place crown sector element. The side elements are pre-cast generally in a horizontal orientation and subsequently lifted into place. The crown sector element is cast in place between the side elements. In one form of the invention, each of the three sections makes up about one-third of the overall arch span.
Claims31
A method of forming a hybrid arched overfilled bridge structure comprising:
- A) defining a first pathway;
- B) defining a second pathway spaced above said first pathway;
- C) providing a plurality of pre-cast side elements;
- D) erecting the pre-cast side elements in two rows along the first pathway to extend toward the second pathway and partially over the first pathway;
- and
- E) casting in place a crown sector element between two pre-cast side elements to extend from one pre-cast side element of the two pre-cast side elements to the other side element of the two pre-cast side elements so the cast-in-place crown sector combines with the two pre-cast side elements to define a bridge over the first pathway, the cast-in-place crown sector having a surface exposed to the first pathway.
A method of forming a hybrid arched overfilled bridge structure comprising:
- A) defining a first pathway;
- B) defining a second pathway spaced above said first pathway;
- C) forming a plurality of pre-cast side elements using a casting table;
- D) adjusting the casting table during the formation of a side element;
- E) providing each side element with a connecting element;
- F) placing two footing strips adjacent to the first pathway, with one footing strip on each side of the first pathway;
- G) supporting one end of each of the pre-cast side elements on one of the footing strips;
- H) forming two rows of footing strips along the first pathway, and orienting each pre-cast side element to extend from the footing strip toward the second pathway and partially over the first pathway with the connecting element extending over the first pathway;
- I) placing a crown sector formwork on the footing strips;
- J) adjusting the crown sector formwork;
- K) supporting the pre-cast side elements against the formwork;
- L) pouring a concrete mix onto the crown sector formwork and onto the connecting elements;
- and
- M) casting in place a crown sector element on the formwork and between the two rows of pre-cast side elements to extend from one pre-cast side element in one row of the two rows of pre-cast side elements to a second pre-cast side element in a second row of the two rows of pre-cast side elements;
- and
- N) locking the crown sector element to the side elements so the cast-in-place crown sector combines with the pre-cast side elements to define a structure over the first pathway.
A method of forming a hybrid arched overfilled bridge structure comprising:
- A) defining a first pathway;
- B) defining a second pathway spaced above said first pathway;
- C) forming a plurality of arcuate pre-cast side elements using a casting table having an arcuate work surface;
- D) heating a pre-cast side element while it hardens after pouring;
- E) adjusting the casting table during the formation of a side element;
- F) providing each side element with a connecting element;
- G) placing two footing strips adjacent to the first pathway, with one footing strip on each side of the first pathway;
- H) supporting one end of each of the pre-cast side elements on one of the footing strips;
- I) forming two rows of footing strips along the first pathway and orienting each pre-cast side element to extend from the footing strip toward the second pathway and partially over the first pathway with the connecting element extending over the first pathway;
- J) placing a crown sector formwork on the footing strips;
- K) adjusting the crown sector formwork using mechanical elements;
- L) providing reinforcing elements adjacent to the crown sector formwork;
- M) sealing ends of the crown sector form;
- N) supporting the pre-cast side elements against the formwork;
- O) pouring a concrete mix onto the crown sector formwork and onto the connecting elements and onto the reinforcing elements;
- P) casting in place a crown sector element on the formwork and between the two rows of pre-cast side elements to extend from one pre-cast side element in one row of the two rows of pre-cast side elements to a second pre-cast side element in a second row of the two rows of pre-cast side elements;
- Q) heating the concrete mix on the crown sector form during curing;
- R) locking the crown sector element to the side elements so the cast-in-place crown sector combines with the pre-cast side elements to define a bridge over the first pathway;
- S) forming an end treatment at each end of the bridge;
- and
- T) backfilling around the bridge.
A method of forming a hybrid arched bridge structure over a first pathway, comprising:
- A) providing a plurality of pre-cast side elements;
- B) erecting the pre-cast side elements in two spaced apart rows along the first pathway, each pre-cast side element extending partially over the first pathway;
- and
- C) casting in place one or more crown sector elements between the two spaced apart rows of pre-cast side elements such that the one or more crown sector elements connect the two spaced apart rows of pre-cast side elements to define a bridge over the first pathway;
- D) wherein at least one or the one or more crown sector elements has a surface exposed to the first pathway.
A method of forming a hybrid arched overfilled bridge structure comprising:
- A) defining a first pathway;
- B) defining a second pathway spaced above said first pathway;
- C) providing a plurality of pre-cast side elements;
- D) erecting the pre-cast side elements in two rows along the first pathway to extend toward the second pathway and partially over the first pathway;
- E) casting in place a crown sector element between two pre-cast side elements to extend from one pre-cast side element of the two pre-cast side elements to the other side element of the two pre-cast side elements so the cast-in-place crown sector combines with the two pre-cast side elements to define a bridge over the first pathway;
- and
- F) providing a casting table for the production of side elements having an arcuate form surface and an adjustable end and a connection element on another end, moving the adjustable end, and pouring concrete mix onto the form surface of the casting table to form an arcuate pre-cast side element.
Dependencies are inferred from the claim text.