Early fault detection in pump valves
AssigneeLEWA Herbert Ott GmbH & Co.
InventorsEberhard Schluecker, Ralf Benken, Michael Stritzelberger
Life of this patent
Estimating the term…
Loading patent…
AssigneeLEWA Herbert Ott GmbH & Co.
InventorsEberhard Schluecker, Ralf Benken, Michael Stritzelberger
Estimating the term…
In a process for the monitoring and automatic early fault detection in valves, in particular intake and/or pressure valves, of an oscillating displacement pump, in particular a membrane dosing pump, it is provided that the increased operating noise produced by a leaky valve due to the back-flow of the fluid being pumped in the closed state of the valve is used as a measure for the leakiness of the valve by the generated effective signal level being monitored continuously and compared to a reference signal level formed from the operating noise of the pump with an intact valve, where, at a predefined level deviation or change due to increased operating noise, early fault detection is triggered. A device for carrying out of this process includes a corresponding measuring device, in particular in the form of a vibration acceleration sensor measuring the produced structure-borne sound as well as a comparator device.
Process for the monitoring and automatic early fault detection in valves of an oscillating displacement pump, said process comprising the steps of
Device for carrying out a process for the monitoring and automatic early fault detection in valves of an oscillating displacement pump, said process comprising the steps of continuously monitoring operating noise produced by a leaky pump valve due to back-flow of fluid pumped in a closed state of the pump valve and using the monitored operating noise as a measure for leakiness of the pump valve by a generated effective signal level, comparing the generated effective signal level to a reference signal level formed by operating noise of the pump with an intact pump valve, and triggering early fault detection of the leaky pump valve at a predefined signal level deviation or change due to increased operating noise of the leaky pump valve, said device comprising
Dependencies are inferred from the claim text.