Method and apparatus for reducing scheduling conflicts for a resource
AssigneeAdvanced Micro Devices, Inc.
InventorsLarry D. Barto, Yiwei Li, Steven C. Nettles, H. Van Dyke Parunak
Life of this patent
Estimating the term…
Loading patent…
AssigneeAdvanced Micro Devices, Inc.
InventorsLarry D. Barto, Yiwei Li, Steven C. Nettles, H. Van Dyke Parunak
Estimating the term…
A method includes providing a schedule of engagements for a resource. Each engagement has a working window and an associated engagement density function. The engagement density functions of the scheduled engagements are combined to generate a committed capacity function for the resource. A region of violation in the committed capacity function is identified where the committed capacity of the resource exceeds a capacity threshold. An area of a region of overlap between the working window of a selected one of the engagements and the region of violation is determined. An area reduction amount for the selected engagement is determined based on a portion of the area of the region of overlap. The working window of the selected engagement is changed based on the area reduction amount.
A method, comprising:
A system, comprising:
A system, comprising:
Dependencies are inferred from the claim text.