Process for determining the resistivity of a formation through which a well equipped with a casing passes
AssigneeSchlumberger Technology Corporation
InventorsIsabelle Dubourg, Ollivier Faivre, Gilles Rouault
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchlumberger Technology Corporation
InventorsIsabelle Dubourg, Ollivier Faivre, Gilles Rouault
Estimating the term…
Process for determining the resistivity (Rt) of a formation (9) surrounding a well (10) equipped with a casing (11) consisting of several casing segments (11.i, 11.s) with an overlapping part (1), and cement (3) in the overlapping part (1), in which a current is injected into the casing (11) to cause a leakage current (Ifor) into a area (8) of the formation (9) offset from the overlapping part (1), the leakage current (Ifor) in the measurement area (8) is determined and is used to deduce the measured resistivity (Rm) of the formation, a current is injected into the casing (11) to cause a current leakage (Icem) in the cement (3) of the overlapping part (1), the leakage current (Icem) in the cement (3) in the overlapping part (1) is determined, and is used to deduce the measured resistivity (Rcem) of the cement (3), the measured resistivity (Rm) of the formation (9) is corrected using a factor to take account of the measured resistivity (Rcem) of the cement (3) to obtain the resistivity (Rt) of the formation (9). Application particularly to oil exploration.
Process for determining the resistivity (Rt) of a geological formation (9) surrounding a well (10) equipped with a casing (11) consisting of several casing segments (11.i, 11.s) following each other, in which two successive casing segments (11.i, 11.s) have an overlapping part (1), the cement (3) located between the casing (11) and the formation (9) and in the overlapping part (1) between two adjacent casing segments (11.i, 11.s),
Dependencies are inferred from the claim text.