Method for determining pressure of earth formations
AssigneeSchlumberger Technology Corporation
InventorsAlexander Zazovsky, Julian J. Pop, Paul S. Hammond
Life of this patent
Estimating the term…
Loading patent…
AssigneeSchlumberger Technology Corporation
InventorsAlexander Zazovsky, Julian J. Pop, Paul S. Hammond
Estimating the term…
A method for determining formation pressure at a depth region of formations surrounding a borehole, including: keeping track of the time since cessation of drilling at the depth region; deriving formation permeability at the depth region; causing wellbore pressure to vary periodically in time and determining, at the depth region, the periodic and non-periodic component of pressure measured in the formations; determining, using the time, the periodic component and the permeability, the formation pressure diffusivity and transmissibility and an estimate of the size of the pressure build-up zone around the wellbore at the depth region; determining, using the time, the formation pressure diffusivity and transmissibility, and the non-periodic component, the leak-off rate of the mudcake at the depth region; determining, using the leak-off rate, the pressure gradient at the depth region; and extrapolating, using the pressure gradient and the size of the build-up zone, to determine the formation pressure.
A method for determining the virgin formation pressure at a particular depth region of earth formations surrounding a borehole drilled using drilling mud, and on which a mudcake has formed, comprising the steps of:
A method for determining the virgin formation pressure at a particular depth region of earth formations surrounding a borehole drilled using drilling mud, and on which a mudcake has formed, comprising the steps of:
A method for determining the virgin reservoir pressure at a particular depth region of earth formations surrounding a borehole drilled using drilling mud, and on which a mudcake has formed, comprising the steps of:
A method for determining the leak-off rate of a mudcake formed, at a particular depth region, on a borehole drilled in formations using drilling mud, comprising the steps of:
Dependencies are inferred from the claim text.