Back to results
US 7,031,789 B1Granted
Process management system and method
AssigneePrecision Automation, Inc.
InventorsSpencer B. Dick, Wesley Aday, David A. Morgan, David Lee
Life of this patent
Estimating the term…
Abstract
A system for managing projects enables manipulation and downloading of one or more cut lists to a controller. The controller then interfaces with a saw machine to optimize processing of material in a manufacturing operation.
Claims8
A method of processing material comprising
- providing a material list for a product,
- loading the material list into a job manager,
- moving the material list into a spreadsheet,
- selecting a field in the spreadsheet,
- downloading the selected field of data to an optimizer,
- selecting a piece of wood material for processing,
- inputting data to the optimizer indicating location of defects in the wood material, and
- determining a processing plan for the wood material including excluding the defects and optimizing use of the remaining material according to the selected field of data.
5 more elements
An apparatus for carrying out material processing comprising
- a computer including a job manager program configured to receive a data file including a cut list of wood pieces for a product, to display the cut list in a spreadsheet, and to permit editing, and sorting data by field,
- a saw system for cutting wood including a defect locator configured to input data to the saw system indicating location of defects in a wood piece prior to cutting, and
- an optimizer capable of determining an optimal way of cutting a piece of wood by excluding defects and utilizing remaining wood to satisfy cut list requirements, and
- a downloading mechanism enabling transfer of selected data from the job manager to the optimizer.
1 more element
A method of processing material comprising
- providing a material list for a product,
- loading the material list into a job manager,
- moving the material list into a spreadsheet,
- selecting a field in the spreadsheet,
- multiplying data in the field by a factor,
- downloading the selected field of data to an optimizer,
- downloading the multiplied data from the field to an optimizer,
- selecting a piece of wood material for processing,
- inputting data to the optimizer indicating location of defects in the wood material, and
- determining a processing plan for the wood material including excluding the defects and optimizing use of the remaining material according to the selected field of data.
7 more elements
Dependencies are inferred from the claim text.