System and method for fabrication backup planning
AssigneeTaiwan Semiconductor Manufacturing Company, Ltd.
InventorsJu-Kau Chen, Chao-Fan Chang, Gwo-Chiang Fang
Life of this patent
Estimating the term…
Loading patent…
AssigneeTaiwan Semiconductor Manufacturing Company, Ltd.
InventorsJu-Kau Chen, Chao-Fan Chang, Gwo-Chiang Fang
Estimating the term…
A backup planning device within a fabrication system. The backup planning device schedules backup operations between separately located fabrication facilities by introducing a virtual tool. The capacity of the virtual tool is combined into first capacity information of a tool group to generate second capacity information thereof accordingly. The first capacity information comprises capacity information of effective tools in the respective tool group, while the second capacity information comprises capacity information of effective tools plus the virtual tool thereof. A first manufacturing plan for the tool group is determined according to a master production schedule, a WIP profile, and the second capacity information thereof. A second manufacturing plan is determined according to the workload allocation of the virtual tool in the first manufacturing plan.
A fabrication system, comprising:
A backup planning system scheduling backup operations in a manufacturing system, wherein the manufacturing system comprises a plurality of manufacturing facilities, each of which comprises a plurality of tool groups, and each tool group comprises a plurality of tools, the backup planning system comprising:
A backup planning method, scheduling backup operations in a manufacturing system, wherein the manufacturing system comprises a plurality of manufacturing facilities, each of which comprises a plurality of tool groups, and each tool group comprises a plurality of tools, the method comprising:
A computer readable storage medium for storing a computer program providing a backup planning method implemented in a manufacturing system, wherein the manufacturing system comprises a plurality of manufacturing facilities, each of which comprises a plurality of tool groups, and each tool group comprises a plurality of tools, the method comprising:
Dependencies are inferred from the claim text.