Parts production scheduling method
AssigneeHonda Motor Co., Ltd.
InventorsYasunobu Fukushima, Hiroshi Kobayashi
Life of this patent
Estimating the term…
Loading patent…
AssigneeHonda Motor Co., Ltd.
InventorsYasunobu Fukushima, Hiroshi Kobayashi
Estimating the term…
A parts production scheduling method is provided for preparing, after receipt of a production order schedule of finished vehicles, a production order schedule of parts necessary for the production of the finished vehicles, wherein the production order schedule of the parts, which is divided into plural zones each equivalent to production of a predetermined number of consecutive products in the product order schedule of the higher products, is shifted so that it is ahead of the production order schedule of the higher products by one zone, thereafter, for each zone, parts to be produced on a parts production line are converted into corresponding pieces of parts identification information registered in advance, and the converted pieces of parts identification information are sorted by pre-registered inter-parts similarity information and collated with pre-registered part-by-part production order pattern information.
A parts production scheduling method for preparing a production order schedule of parts necessary for the production of higher products after receipt of a production order schedule of the higher products, comprising the steps of:
Dependencies are inferred from the claim text.