# US 7,006,957 B2 · Locomotive parking management tool

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 7,006,957 B2
- Document ID: US7006957B2
- Status: Granted
- Kind: B2
- Application number: 09/757,833
- Filed: 2001-01-10
- Published: 2001-10-25
- Granted: 2006-02-28
- Earliest claimed: 2000-01-11
- Assignees: GE Harris Railway Electronics, LLC
- Inventors: John R. Doner
- Web page: https://patentgrep.com/patent/US7006957B2

## CPC

- B61L 27/57: for vehicles or trains, e.g. trackside supervision of train conditions
- B61B 1/005: {Rail vehicle marshalling systems; Rail freight terminals (transferring or trans-shipping at storage areas or railway yards; marshalling yard installations B65G63/00)}
- B61L 17/00: Switching systems for classification yards
- G08G 1/123: indicating the position of vehicles, e.g. scheduled vehicles; {Managing passenger vehicles circulating according to a fixed timetable, e.g. buses, trains, trams}(transmission of navigation instructions to vehicles G08G1/0968)
- B61L: GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC (brakes or auxiliary equipment B61H, B61K; point or crossing construction E01B)
- B61B: RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR (lifts or hoists, elevators, escalators, moving walkways B66B)
- G08G: TRAFFIC CONTROL SYSTEMS (guiding railway traffic, ensuring the safety of railway traffic B61L; arrangement of road signs or traffic signals E01F9/00; radar or analogous systems, sonar systems, lidar systems specially adapted for traffic control G01S13/91, G01S15/88, G01S17/88; {radar or analogous systems, sonar systems, lidar systems specially adapted for anti-collision purposes G01S13/93, G01S15/93, G01S17/93})

## Abstract

A system for managing locomotives in a railyard including a parking yard and a service yard, based on possible future states of the parking yard and the service yard. The system includes a computer and utilizes an algorithm that enumerates possible present locomotive placement options, enumerates possible future railyard states arising from each possible present locomotive placement option, examines each possible future railyard state, and determines a present option based on the examination of the possible future railyard states.

## Claims

### Claim 1

A method for managing locomotives in a railyard including a parking yard and a service yard, based on possible future states of the parking yard and the service yard, using a system including a computer, said method comprising the steps of:
establishing an initial state of the locomotives in the parking yard and the service yard;
enumerating possible present locomotive railyard parking options;
enumerating possible future railyard parking configurations arising from each possible present locomotive railyard parking option;
examining each possible future railyard parking configuration;
determining a metric for parking decisions using the initial state of the locomotives in the parking yard and the service yard. an inbound schedule that identifies the locomotives arriving on an inbound train consist, an outbound schedule that identifies which outbound train consist to which each locomotive is assigned, and the possible railyard parking options: and
choosing a resent locomotive railyard parking option based on the examination of the possible future railyard parking configurations and the metric.

### Claim 2 (depends on 1)

A method in accordance with claim 1 wherein said step of enumerating possible present locomotive railyard parking options comprises the steps of:
evaluating a geometry of the parking yard; and
evaluating a geometry of the service yard.

### Claim 3 (depends on 1)

A method in accordance with claim 1 wherein said step of establishing an initial state of the locomotives in the parking yard and the service yard comprises the steps of:
evaluating a present locomotive configuration of the parking yard; and
evaluating a present locomotive configuration of the service yard.

### Claim 4 (depends on 1)

A method in accordance with claim 1 wherein said step of enumerating possible future railyard parking configurations comprises the steps of:
evaluating the initial railyard state; and
evaluating a yard schedule.

### Claim 5 (depends on 4)

A method in accordance with claim 4 wherein said step of evaluating a yard schedule comprises the steps of:
evaluating an inbound locomotive schedule; and
evaluating an outbound locomotive schedule.

### Claim 6 (depends on 5)

A method in accordance with claim 5 wherein said step of evaluating a yard schedule further comprises the steps of:
evaluating service requirements of inbound locomotives;
evaluating a list of locomotive service types provided in the service yard; and
evaluating non-standard movements of locomotives within the railyard.

### Claim 7 (depends on 1)

A method in accordance with claim 1 wherein said step of examining each possible future railyard state comprises the steps of:
examining a cost of each possible future state; and
examining a time based efficiency of each possible state.

### Claim 8 (depends on 7)

A method in accordance with claim 7 wherein said step of examining a cost of each possible future state comprises the steps of:
examining costs incurred from delays to the outbound locomotive schedule caused by the service requirements;
examining costs incurred in performing non-standard movements;
examining costs incurred by schedule delays caused by non-standard movements; and
examining costs incurred by late departure of a locomotive.

### Claim 9 (depends on 7)

A method in accordance with claim 7 wherein said step of examining a time based efficiency of each possible state comprises the steps of:
examining delays to an outbound locomotive schedule caused by the service requirements; and
examining delays caused by non-standard movements.

### Claim 10 (depends on 1)

A method in accordance with claim 1 wherein said step of choosing a present option comprises the step of executing a locomotive management algorithm utilizing the computer.

### Claim 11 (depends on 10)

A method in accordance with claim 10 wherein said step of executing a locomotive management algorithm comprises the steps of:
applying a set of yard management objectives;
applying a set of parking yard management rules; and
applying a set of service yard management rules.

### Claim 12 (depends on 11)

A method in accordance with claim 11 wherein said step of applying a set of yard management objectives comprises the steps of:
assembling an outbound locomotive consist as scheduled;
delivering an outbound locomotive consist as scheduled;
reducing a total labor usage figure for labor involved in assembling and delivering an outbound locomotive consist;
reducing delays in locomotive servicing; and
comparing the cost of late locomotive consist departure to additional labor costs needed to assemble and deliver an outbound locomotive consist as scheduled.

### Claim 13 (depends on 11)

A method in accordance with claim 11 wherein said step of applying a set of parking yard management rules comprises the steps of:
executing locomotive pull-forwards when there is a reduced number of locomotives on an affected parking track;
maintaining an order of locomotives on each parking track such that locomotives for later outbound locomotive consists are parked behind locomotives for earlier outbound locomotive consists; and
parking a lead locomotive for an outbound locomotive consist on a parking track such that the lead locomotive is in front of other locomotives parked on the same track that are allocated for the same outbound locomotive consist.

### Claim 14 (depends on 11)

A method in accordance with claim 11 wherein said step of applying a set of service yard management rules comprises the steps of:
positioning a locomotive in a queue for service on a lead-in track to a service bay that provides the appropriate service;
positioning locomotives in a queue on a lead-in track in an order that allows servicing of each locomotive to be completed before each locomotive is scheduled for assembly in an outbound locomotive consist; and
scheduling short service activities before long service activities when scheduling conflicts are not at issue.

### Claim 15

A networked system for managing locomotives in a railyard including a parking yard and a service yard, based on possible future states of the parking yard and the service yard, said system comprising:
a client system comprising a browser;
a database for storing information;
a server system coupled to said client system and said database, said server system configured to:
establish an initial state of the locomotives in the parking yard and the service yard;
enumerate possible present locomotive railyard parking options;
enumerate possible future railyard parking configurations arising from each possible present locomotive railyard parking option;
examine each possible future railyard state parking configurations;
determine a metric for parking decisions using the initial state of the locomotives in the parking yard and the service yard. an inbound schedule that identifies the locomotives arriving on an inbound train consist, an outbound schedule that identifies which outbound train consist to which each locomotive is assigned, and parking options; and
determine a present option based on the examination of the possible future railyard states and the metric.

### Claim 16 (depends on 15)

A networked system in accordance with claim 15 wherein to enumerate possible present locomotive railyard parking options said server system further configured to:
evaluate a geometry of the parking yard; and
evaluate a geometry of the service yard.

### Claim 17 (depends on 16)

A networked system in accordance with claim 16 wherein to establish an initial state of the locomotives in the parking yard and the service yard said server system further configured to:
evaluate a present locomotive configuration of the parking yard; and
evaluate a present locomotive configuration of the service yard.

### Claim 18 (depends on 16)

A networked system in accordance with claim 16 wherein to enumerate possible future railyard parking configurations said server system further configured to:
evaluate the initial railyard state; and
evaluate a yard schedule.

### Claim 19 (depends on 18)

A networked system in accordance with claim 18 wherein to evaluate a yard schedule said server system further configured to:
evaluate an inbound locomotive schedule; and
evaluate an outbound locomotive schedule.

### Claim 20 (depends on 19)

A networked system in accordance with claim 19 wherein to evaluate a yard schedule said server system further configured to:
evaluate service requirements of inbound locomotives;
evaluate a list of locomotive service types provided in the service yard; and
evaluate non-standard movements of locomotive within the railyard.

### Claim 21 (depends on 15)

A networked system in accordance with claim 15 wherein to examine each possible future railyard state said server system further configured to:
examine a cost of each possible future state; and
examine a time based efficiency of each possible state.

### Claim 22 (depends on 21)

A networked system in accordance with claim 21 wherein to examine a cost of each possible future state said server system further configured to:
examine a cost of delays to the outbound locomotive schedule caused by the service requirements; and
examine a cost of non-standard movements.

### Claim 23 (depends on 21)

A networked system in accordance with claim 21 wherein to examine a time based efficiency of each possible state said server system further configured to:
examine costs incurred from delays to the outbound locomotive schedule caused by the service requirements;
examine costs incurred in performing non-standard movements;
examine costs incurred by schedule delays caused by non-standard movements; and
examine costs incurred by late departure of a locomotive.

### Claim 24 (depends on 15)

A networked system in accordance with claim 15 further configured to execute a locomotive management algorithm by:
applying a set of yard management objectives;
applying a set of parking yard management rules; and
applying a set of service yard management rules.

### Claim 25 (depends on 24)

A networked system in accordance with claim 24 wherein to apply a set of yard management objectives said server system further configured to:
assemble an outbound locomotive consist as scheduled;
deliver an outbound locomotive consist as scheduled;
reduce a total labor usage figure for labor involved in assembling and delivering a locomotive consist;
reduce delays in locomotive servicing; and
compare the cost of late locomotive consist departure to additional labor costs needed to assemble and deliver an outbound locomotive consist as scheduled.

### Claim 26 (depends on 24)

A networked system in accordance with claim 24 wherein to apply a set of parking yard management rules said server system further configured to:
execute locomotives pull-forwards when there is a reduced number of locomotives on an affected parking track;
maintain an order of locomotives on each parking track such that locomotives for later outbound locomotive consists are parked behind locomotives for earlier outbound locomotive consists; and
park a lead locomotive for an outbound locomotive consist on a parking track such that the lead locomotive is in front of other locomotives parked on the same track that are allocated for the same outbound locomotive consist.

### Claim 27 (depends on 24)

A networked system in accordance with claim 24 wherein to apply a set of service yard management rules said server system further configured to:
position a locomotive in a queue for service on a lead-in track to a service bay that provides the appropriate service;
position locomotives in a queue on a lead-in track in an order that allows servicing of each locomotive to be completed before each locomotive is scheduled for assembly in an outbound locomotive consist; and
schedule short service activities before long service activities when scheduling conflicts are not at issue.

### Claim 28 (depends on 15)

A networked system according to claim 15 wherein the client system and the server system are connected via a networked and wherein the network is one of a wide area network, a local area network, and an Intranet and the Internet.

### Claim 29 (depends on 15)

A networked system according to claim 15 wherein said server system is further configured with a displaying component for displaying various user interfaces to the user, a receiving component for receiving an inquiry to provide information from one of a plurality of users, a collection component for collecting information from users into the centralized database, a tracking component for tracking information on an on-going basis, and an accessing component for accessing the centralized database and causing the retrieved information to be displayed on the client system.

### Claim 30 (depends on 29)

A networked system according to claim 29 wherein said server system further configured with a processing component for searching and processing received inquiries against the data storage device containing a variety of information collected by the collection component.

### Claim 31 (depends on 29)

A networked system according to claim 29 wherein said server system further configured with a retrieving component to retrieve information from the data storage device.
