Method to control high condenser pressure
AssigneeCarrier Corporation
InventorsMichal K. Grabon, Ba-Tung Pham
Life of this patent
Estimating the term…
Abstract
A method for controlling load capacity in an air conditioning unit comprising the steps of initializing a saturated condensing temperature upper bound (SCT_UP), comparing a saturated condensing temperature (SCT) to a maximum condensing temperature threshold (MCT_TH), unloading a single load capacity step, allowing the air conditioning unit to stabilize, and setting the SCT_UP equal to the SCT after the unloading, and increasing the load capacity by one capacity step if increased load capacity is required, the SCT is less than or equal to the MCT_TH, and the SCT<the SCT_UP.
Claims12
A method for controlling load capacity in an air conditioning unit comprising the steps of:
- initializing a saturated condensing temperature upper bound (SCT_UP);
- comparing a saturated condensing temperature (SCT) to a maximum condensing temperature threshold (MCT_TH);
- unloading a single load capacity step, allowing said air conditioning unit to stabilize, and setting said SCT_UP equal to said SCT after said unloading;
- and
- increasing said load capacity by one capacity step if increased load capacity is required, said SCT is less than or equal to said MCT_TH, and said SCT<said SCT_UP.