Integrated wafer fabrication production characterization and scheduling system
AssigneesSony Corporation, Sony Electronics Inc.
InventorGuillermo Rudolfo Chacon
Life of this patent
Estimating the term…
Abstract
An integrated wafer fab production scheduling and simulation system incorporates a manufacturing execution system with a scheduling system based on simulation. The integrated system provides manufacturers with a simulation tool integrated with the manufacturing execution system to evaluate proposed production control logic as a practical alternative to expensive experimentation on an actual production system. Furthermore, simulation models are used to create short-term dispatch schedules to steer daily manufacturing operations towards planned performance goals. Innovative features include integration of preventive maintenance scheduling, Kanban based WIP control, an integrated time standard database, and real time lot move updates.
Claims40
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- and
- a plurality of input stations located along said production line, wherein each of said input stations provides a user with access to said model in said database and allows said user to override said model and input instructions to said manufacturing execution system.
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution system in separate transmissions of said feedback data,
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- and
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs.
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution system in separate transmissions of said feedback data;
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- and
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs;
- and
- wherein said manufacturing execution system rechecks a routing schedule for said production inputs and said product lots each time a transmission of said second set of feedback data is received.
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution system in separate transmissions of said feedback data;
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- and
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs;
- wherein said manufacturing execution system determines a capacity of said equipment in said production line based on said first set of feedback data and generates routes for said product lots in accordance therewith;
- and
- wherein said manufacturing execution system scans generated routes for equipment in said production line without a determined capacity to determine potential problem areas in said generated routes.
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- wherein said system records a history of changes in said feedback data for use by a user in upgrading said model.
An integrated scheduling and simulation system for a manufacturing facility comprising:
- a manufacturing execution system for automatically controlling routing of product lots and production inputs in a manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution system;
- a database for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- a simulating system for simulating operation of said production line according to said model, said simulating system using said feedback data from said database in performing said simulation, said simulating system further comprising a user interface through which changes to said model can be made;
- wherein said production line produces semiconductor devices.
A system for controlling a manufacturing production line using a manufacturing execution control means comprising:
- said manufacturing execution control means for automatically controlling routing of product lots and production inputs in said manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution control means;
- database means for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- simulating means for simulating operation of said production line according to said model, said simulating means using said feedback data from said database means in performing said simulation, said simulation means further comprising a user interface means through which changes to said model can be made;
- and
- a plurality of input stations located along said production line, wherein each of said input stations provides a user with access to said model in said database means and allows said user to override said model and input instructions to said manufacturing execution control means.
A system for controlling a manufacturing production line using a manufacturing execution control means comprising:
- said manufacturing execution control means for automatically controlling routing of product lots and production inputs in said manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution control means;
- database means for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- simulating means for simulating operation of said production line according to said model, said simulating means using said feedback data from said database means in performing said simulation, said simulation means further comprising a user interface means through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution control means in separate transmissions of said feedback data,
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- and
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs.
A system for controlling a manufacturing production line using a manufacturing execution control means comprising:
- said manufacturing execution control means for automatically controlling routing of product lots and production inputs in said manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution control means;
- database means for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- simulating means for simulating operation of said production line according to said model, said simulating means using said feedback data from said database means in performing said simulation, said simulation means further comprising a user interface means through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution control means in separate transmissions of said feedback data,
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs;
- and
- wherein said manufacturing execution control means rechecks a routing schedule for said production inputs and said product lots each time a transmission of said second set of feedback data is received.
A system for controlling a manufacturing production line using a manufacturing execution control means comprising:
- said manufacturing execution control means for automatically controlling routing of product lots and production inputs in said manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution control means;
- database means for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- simulating means for simulating operation of said production line according to said model, said simulating means using said feedback data from said database means in performing said simulation, said simulation means further comprising a user interface means through which changes to said model can be made;
- wherein said feedback data is divided into two sets of data received by said manufacturing execution control means in separate transmissions of said feedback data,
- wherein a first of said two sets of data comprises data specifying a type of equipment in said production line;
- wherein a second of said two sets of data comprises data specifying an operating status of said equipment, status of said product lots and status of said production inputs;
- wherein said manufacturing execution control means determines a capacity of said equipment in said production line based on said first set of feedback data generates routes for said product lots in accordance therewith;
- and
- wherein said manufacturing execution control means scans generated routes for equipment in said production line without a determined capacity to determine potential problem areas in said generated routes.
A system for controlling a manufacturing production line using a manufacturing execution control means comprising:
- said manufacturing execution control means for automatically controlling routing of product lots and production inputs in said manufacturing production line based on a production scheduling model, wherein feedback data from said production line is provided to said manufacturing execution control means;
- database means for storing said model and said feedback data, wherein said feedback data is used to provide values for variables of said model;
- and
- simulating means for simulating operation of said production line according to said model, said simulating means using said feedback data from said database means in performing said simulation, said simulation means further comprising a user interface means through which changes to said model can be made;
- wherein said system records a history of changes in said feedback data for use by a user in upgrading said model.
A system for controlling a manufacturing production line using a virtual kanban system comprising:
- a manufacturing execution system that automatically controls routing of product lots and production inputs in the manufacturing production line, said manufacturing execution system monitors consumption of the production inputs and orders additional production inputs using an electronic kanban;
- a production scheduling model that includes a virtual kanban system, wherein the virtual kanban system outputs the electronic kanban, the electronic kanban representing a production routing schedule;
- a database that stores the production scheduling model and production line feedback data, the production line feedback data further comprising a first data set that specifies equipment in the production line and a second data set that specifies at least one of operating status of the equipment, product lots status and production inputs status;
- a simulator that simulates operation of the production line and determines validity of said electronic kanban, said simulator receiving as input the electronic kanban from the production scheduling model and the production line feedback data from the database, the simulator further comprising a user interface;
- wherein when the electronic kanban is determined valid by the simulator, the electronic kanban is output to the manufacturing execution system and a work schedule is generated.
A method for controlling a manufacturing production line using a virtual kanban system, the method comprising the steps of:
- storing production line feedback data in a database;
- inputting said feedback data into a production scheduling model that includes the virtual kanban system and generating an electronic kanban;
- inputting the electronic kanban and the feedback data to a simulator and simulating the manufacturing production line;
- determining the validity of the electronic kanban;
- inputting the electronic kanban into a manufacturing execution system;
- and
- generating a routing schedule of at least one of production inputs and production lots;
- wherein the feedback data comprises a first data set specifying a type of equipment in the production line and a second data set specifying at least one of operating status of equipment, product lot status and production inputs status.
A system for simulating a manufacturing production line and generating a production schedule for the manufacturing production line comprising:
- a manufacturing execution system that automatically controls routing of product lots and production inputs in the manufacturing production line based on a production schedule output from a production scheduling model and feedback data from said production line;
- a database that stores the production scheduling model and production line feedback data, the production line feedback data further comprising a first data set that specifies equipment in the production line and a second data set that specifies at least one of operating status of the equipment, product lots status and production inputs status, wherein said feedback data is provided to the production scheduling model;
- a simulator that simulates operation of the production line according to input from the production scheduling model and the production line feedback data from the database, the simulator further comprising a user interface;
- wherein the manufacturing execution system determines the validity of the routing schedule each time at least one of the first data set and the second data set from the production line is input to the manufacturing execution system.
Dependencies are inferred from the claim text.