A production equipment management method of performing simulation in a virtual production line so constructed as to provide a computer with substantially the same functions as for a real production line which actually manufactures products and comprises a plurality of manufacturing devices, and managing production equipment based on this simulation result, said method comprising:
- receiving various information including information of operation of each of said plurality of manufacturing devices about said real production line by means of said virtual production line;
- computing at least one time dependency of electric power and power usage, with respect to each of a plurality of operating conditions in which operation timing of said each of said plurality of manufacturing devices is shifted from each other, based on said received information;
- setting at least one of an electric power value and a power usage value used for a production line based on the time dependency obtained by said means for computing the time dependency as regards said each of said plurality of operating conditions;
- and
- manufacturing production equipment so that at least one of said determined electric power value and power usage value is satisfied.