System and method for periodic task resumption following redundant control system switchover
AssigneeRockwell Automation Technologies, Inc.
InventorsWilliam Cook, Mark Flood
Life of this patent
Estimating the term…
Loading patent…
AssigneeRockwell Automation Technologies, Inc.
InventorsWilliam Cook, Mark Flood
Estimating the term…
A method and apparatus are disclosed for performing timely execution of periodic tasks in a redundant control system. A secondary controller in the redundant system receives a wakeup time array having at least one wakeup time element corresponding to a periodic task as well as a current time value from a primary controller, and schedules a run time for the periodic task at switchover based on the wakeup time element and the current time value from the primary control module. The secondary controller may further receive a task instance corresponding to the periodic task from the primary control module, and schedule a run time for the periodic task at switchover based on the task instance. In addition, the secondary controller may schedule a run time for the periodic task at switchover based on a default period associated with the periodic task, if no task instance and no wakeup time element were received corresponding to the periodic task.
A redundant control system for controlling an industrial process, comprising:
In a redundant industrial control system, a method for ensuring timely execution of periodic tasks, comprising:
In a redundant control system having a primary controller for controlling a process and a secondary controller adapted to assume control of the process upon a switchover event, a method for operating the primary controller, comprising:
In a redundant control system having a primary controller for controlling a process and a secondary controller adapted to assume control of the process upon a switchover event, a method for operating the secondary controller, comprising:
A primary controller for controlling a process in a redundant control system having a secondary controller adapted to assume control of the process upon a switchover event, and to send wakeup time information to the secondary controller during qualification of the secondary controller, wherein the wakeup time information comprises at least one wakeup time value corresponding to at least one periodic task associated with the process.
A secondary controller adapted to assume control of a process from a primary controller in a redundant control system upon a switchover event, and to obtain wakeup time information from the primary controller during qualification of the secondary controller, wherein the wakeup time information comprises at least one wakeup time value corresponding to at least one periodic task associated with the process;
Dependencies are inferred from the claim text.