Process for eliminating vertical flash on an as-forged connecting rod
AssigneeGKN Sinter Metals, LLC
InventorsTimothy E. Geiman, Ronald Lee Trosin, Henry James Knott
Life of this patent
Estimating the term…
Loading patent…
AssigneeGKN Sinter Metals, LLC
InventorsTimothy E. Geiman, Ronald Lee Trosin, Henry James Knott
Estimating the term…
A presently-preferred process for manufacturing a connecting rod comprises placing a heated preform suitable for being formed into the connecting rod into a closed forge die, and forging the preform in a first forging operation while the preform is at a forging temperature to form an as-forged connecting rod having vertical flash extending therefrom. The presently-preferred process further comprises placing the as-forged connecting rod in a second forge die while the as-forged connecting rod is at a temperature substantially equal to the forging temperature, and forging the vertical flash in a second forging operation. The presently-preferred process also comprises removing the as-forged connecting rod from the second forge die, and machining the as-forged connecting rod to predetermined dimensions.
A process for manufacturing a connecting rod, comprising:
A process for manufacturing a connecting rod, comprising:
A process for eliminating vertical flash on an as-forged connecting rod, comprising:
A process for manufacturing a connecting rod, comprising:
A process for manufacturing a connecting rod, comprising:
Dependencies are inferred from the claim text.